CHAPTER 10: SHUT OFF CIRCUIT BREAKER
Shut the installation site branch Circuit Breaker OFF. Failure to do so may result in serious
personal or fatal injury. When uncertain whether power supply is disconnected, always verify
using a voltmeter.
All high voltage electrical connections must be made by licensed electricians according to
National and Local electrical codes/regulations.
Permanent wiring shall be employed as required by local codes.
Electrical circuit to Nabco operator must not be not shared with other equipment such as
lighting, cash registers, or any device that might cause electrical interference on the circuit.
Keep sufficient spacing between high-voltage and low-voltage wiring. 120 VAC Power wires
must be routed (separate from other wiring) located near the top of inside Header.
Ensure that incomming electrical ground is properly secured to the grounding screw or
grounding wire, whichever is provided.
Attention: Insert all Incoming 120 VAC Power wires into the pre drilled Electric Service Access Hole located at the
left or right side of Header End Cap.
Attention: Electrical circuit to Nabco operator must not be not shared with other equipment such as lighting,
cash registers, or any device that might cause electrical interference on the circuit.
Attention: Any non-factory low voltage wiring added inside the Header must be Type CL2 wire or the equivalent
in accordance with Article 725 of the NEC.
Note: It is recommended for the Installer to house all Incoming 120 VAC wires within an Electrical Conduit.