2.1 Flue connection
The flue connection process must follow the regulations and the certification.
The flue connection is an important process which affects the stove’s
operation and function. That is why it must be performed only by authorized
personnel.
The installations that do not comply with the regulations and that are
performed by unauthorized personnel result in guarantee’s cancelation.
Before the installation, you should make sure that the internal cross-section
and the height of the flue pipe are correct.
Make sure the flue pipe is not clogged or that it is not installed incorrectly.
Where there are flue pipe connections no reduction of the
diameter in relation with the stove’s outlet is allowed. No use of reduction
fittings is allowed.
To ensure proper operation, avoid placing horizontal sections as they can be
filled with ash and this result in the reduction of the diameter
Large number of curves should be neither placed. The overall connection of
the curves should be made in a stable manner so as to ensure maximum
safety and minimum load losses.
Do not open the door of the boiler when it is on or
when it is in the process of closing.
Do not touch the device when it is on. Serious burns can
be caused.
When the exhaust path is higher than 10m and works under reduced traction
conditions (presence of a large number of curves, long horizontal sections,
unsuitable discharge terminals, etc.) extraction of the exhaust gas may not be
optimal.