
Installation
operation and installation manual
zappi
37
Using
zappi
template mark mounting holes. For
fixing to brick, use the top and 2 bottom holes
(left/right). Use the 2 vertical holes as well as the
top hole if mounting to a stud wall or joist.
To maintain the IP rating of the unit you will need
to add bungs (provided) to the unused holes.
Secure the unit to the wall using the fixing kit
provided. Ensure the grommets are used to
maintain its IP integrity.
Note: if using the rear cable entry, remember to
insert the mains cable before mounting to the wall!
Ensure O-ring is present and sits neatly into its
channel.