
Installation
36
zappi
operation and installation manual
Installation
When installing and wiring the
zappi
, care should be taken to maintain the IP rating of the unit.
Ensure that the grommets and bungs provided are fitted, the O-ring behind the cover is seated correctly
and that the incoming power and CT cables are fitted using an appropriate size and type of gland
.
Carefully remove fascia from the
zappi
by
pressing the 2 clips located at the bottom of unit
inwards whilst pulling the fascia towards you.
If installing a tethered
zappi
, you must ensure the
cable wall guard is fixed to the unit using the 4
screws supplied.
If installing an untethered
zappi
go to next step.
Remove all 8 screws from the enclosure and
carefully lift away.
There are 4 possible cable entry positions,
carefully decide which one you are going to use
from the above image.
You will need an IP65 or above rated cable gland.
Carefully drill a hole into the unit to match the size
of your cable gland. Attach cable gland ensuring
IP rating is met.