my!
WIND
Ltd.
Soola 1a
51013 Tartu, Estonia
Email: [email protected]
Website: www.mywind.ee
3 |
P a g e 2 6 / 0 7 / 2 0 1 9
7.
Erection of the turbine ................................................................................................................... 22
Step 1: Lifting the tower ..................................................................................................................... 22
Step 2: Disconnecting the lifting equipment ...................................................................................... 23
Step 3: Placing the tower junction box .............................................................................................. 23
Annex 1
– Levelling the tower with ITS-2-45 dual axis inclinometer .................................................... 25
Annex 2
– Tower verticality ................................................................................................................... 26
General remarks
Please
read this manual thoroughly through before beginning the assembly.
No guarantee is
assumed by my!WIND for the correct interpretation and application of the information by the
customer. In case any incomplete, incomprehensible or erroneous information is detected, the
circumstances must be clarified immediately my!WIND representative or local dealer.
This document supersedes any previously released version.