12. COMMISSIONING AND ANNUAL MAINTENANCE TESTING 

Before commissioning the following checks and tests 

need to have taken place:

•   All the pipe work has been flushed through before 

fitting the valve and there are no leaks.

•   The supply pressures and temperatures are 

checked and all are in the range specified in these 

instructions.

•   The isolation valves and strainers are fitted and 

clean of any unwanted material and do not restrict 

flow.

•   The valve has been fitted to the pipework with all 

connections correctly tightened.

COMMISIONING PROCEDURE

1.  Ensure both isolation valves are fully open. Turn the 

temperature control to cold and turn the flow on.

   Check the temperature is at the required 

minimum. 

2.  Rotate the temperature controller gradually until 

it reaches the preset stop. Let it flow until the hot 

water has reached the valve and the temperature 

has stabilized. 

  Check the temperature is 38˚C +/-2˚C. 

   This is the factory preset. If the valve does not 

operate properly check and confirm that the hot 

and cold water supplies are fitted to the correct 

inlets.

3.  Override the temperature stop button by pressing 

the button and rotate to maximum being careful to 

avoid scalding. 

  Measure the temperature.

4.  The valve should then be checked to confirm the 

water isolation performs correctly. Run the valve at 

the 38˚C stop position. 

  Check the water temperature. 

5.  Turn off the feed of cold water using the isolation 

valve. 

  

The water flow should fall to a very low flow, 

(possibly only a drip) after a few seconds.

 

6.  Collect the water after 5 seconds and 30 seconds.

M

easure the temperature – it should be below 

46˚C +/- 2˚C . 

7.  Turn on the cold water again and

 it should return 

after a few seconds to stabilise to 38˚C +/- 2˚C

TEMPERATURE SETTING ADJUSTMENT

NOTE: Adjustment of the temperature settings is only 

to be carried out by a competent TMV engineer as it is 

a technically difficult operation in which the valve can 

easily be broken. 

1.  Remove the handle on the temperature controller, 

(noting carefully the assembly of the components).

2.  Rotate the internal stops a few degrees in the 

required direction.

3. Reassemble. 
4.  All the commissioning checks should be done 

again to ensure it now meets the required 

specification before using the shower.

Before use, ensure that you instruct 

all users in the safe operation of the 

shower as outlined in this document.

!

!

11. OPERATION

TO CONTROL THE FLOW 

Slide the lower handle to the left, anti-clockwise, 

to turn on and increase the flow. Slide to the left, 

clockwise to decrease and turn off. 

TO CONTROL THE TEMPERATURE 

Turn the centre handle anti-clockwise, for hot and 

clockwise for cold.

Overhead Flow Control

Temperature Control

Handset Flow Control

Содержание Atmos 2 Way

Страница 1: ...Fitting Instructions IMPORTANT This Step by Step guide should be retained after installation Atmos 2 Way Thermostatic Mixer Valve for Round and Square Valve Options...

Страница 2: ...umof5barrunning pressure Themixervalvemustnotbesubjectedto watertemperaturesabove80 C Thismixervalveis alsosuitableforthermalstorage unventedsystems andpumpedgravitysystems IMPORTANT Beforeinstallingw...

Страница 3: ...RTANT This Step by Step guide should be retained after installation Concealing Plate Nut Cover Please make sure ALL components are included before starting the installation Description Quantity MixerV...

Страница 4: ...dent method of isolating the shower should maintenance or servicing be necessary these valves SHOULD NOT restrict the flow DO NOT operate the shower outside the recommended temperatures and pressures...

Страница 5: ...Itis veryimportantthatforuseinanymainspressure systemsanexpansiontankandapressurereducing valvehasbeenfittedtoensurethepressuredoes notexceed5Bar Thisshouldbeconfirmedbytheinstallation engineerorcompe...

Страница 6: ...thesame hotandcoldwaterpressures Ifthisisnotthecasea flowcontroller discwithsmallholes canbefittedto thehigherpressuresupplytothevalve Thisisbest donebytestingeachonetofindoutwhichgivesthe bestresults...

Страница 7: ...pointyoumaywishtofitthepipeworkto oultetspriortoanytiling 5 Thevalveshouldbeattachedfirmlybetween75mm and95mmbelowthefinishedsurfacetoallowthe coverplatetofitneatly usingthetwofixingholeson thevalve P...

Страница 8: ...ntothemixer valveuntilflushwiththetiles Fig5 NOTE Beforeassemblingthevalvecontrolsidentify allthepartsandcheckthatboththeredmarkingson thecontrolshaftofthethermostaticcontrolareinline 11 Fittheon offk...

Страница 9: ...becheckedtoconfirmthe waterisolationperformscorrectly Runthevalveat the38 Cstopposition Checkthewatertemperature 5 Turnoffthefeedofcoldwaterusingtheisolation valve Thewaterflowshouldfalltoaverylowflow...

Страница 10: ...evalveandcleanfilters 4 Showerheadblocked CleanShowerhead 5 Systemnotcapableofsupplyingmultipleoutlet atthesametime Reducesimultaneousdemand Checkstop servicevalvesarefullyopen Checkifenough waterpres...

Страница 11: ...ustomer 2 Thisguaranteeispersonaltotheoriginalpurchaserofthe productandisnottransferable 3 Originalproofofpurchase s mustbeshownforanyclaim underthisguarantee 4 Thisguaranteedoesnotcoveranyproductstha...

Страница 12: ...from this list without prior notice being given 67531KL JULY2016 14 SERVICEPOLICY IntheeventofyouneedingtocontacttheMXGroup CustomerServiceDepartment thefollowing procedureshouldbefollowed 1 Beforetel...

Отзывы: