background image

7. IMPORTANT INSTALLATION INFORMATION

Before proceeding with the installation check all the 

components in the component list are present.

WARNING! 

The shower must not be positioned where 

it will be subject to freezing conditions.

The mixer valve should be fitted only after all the 

pipework has been installed. Isolating valves should 

be fitted to both hot and cold water supplies for 

servicing purposes.

DO NOT modify or use jointing compounds on any of 

the pipe fittings. DO NOT solder fittings near the mixer 

valve as heat can damage the valves seals. Always 

flush the system prior to installing the valve.

Before installing, make sure the mixer valve is kept 

in a clean place to prevent any debris getting into the 

openings while fitting the pipework.

n

  The mixer valve is suitable for installation on a solid 

wall, a stud partition wall, dry lined wall or fixing to a 

cubicle or panel.

n

  The water pipes should be securely attached 

within the wall or panel to support the mixer valve and 

prevent movement or water noise after installation.

n

  The mixer valve hot water inlet has a red symbol 

next to the inlet and must be on the left hand side. If 

the mixer valve you are fitting is with a riser rail the 

outlet should point down, if the mixer valve is for an 

overhead the outlet should point upwards. 

n

  The mixer valve is designed to work at the same 

hot and cold water pressures. If this is not the case a 

flow controller (disc with small holes) can be fitted to 

the higher pressure supply to the valve. This is best 

done by testing each one to find out which gives the 

best results.

n

  The mixer valve will be installed in such a position 

that the maintenance of the TMV and its valves and 

the commissioning and testing of the TMV can be 

undertaken.

Before fitting the mixer valve flush out the pipework in 

accordance with Water Regulations Advisory Service 

(www.wras.co.uk).

The MX Options range of thermostatic mixer valves is 

suitable for use with the following systems: 
Gravity Fed, Gas Combination Boiler, Pumped Gravity, 

Mains Pressure (Thermal Store), Unvented Systems.

NOTE: On gravity systems the minimum distance 

from the underside of the cold water storage tank to 

the shower head must be 1 metre.

!

!

8. PRESSURE BALANCING (IF SUPPLIED)

The thermostatic mixer valve is designed to work best when the feed pressures of both 

hot and cold water are the same. If there is a difference in pressure it will cause the 

flow of water through the valve to pulse rather than being a steady flow. This pulsing 

can be reduced by putting one of the metal disks with holes into the higher pressure 

feed to the valve. This restricts the flow and reduces the pulsing.

To maximise the volume of water through the valve the disk with the most holes 

should be tried first. If this does not work the others should be tried until a 

satisfactory result is obtained. 

If the water pressures to hot and cold are the same these disks do not need  

to be used.

Содержание Atmos 2 Way

Страница 1: ...Fitting Instructions IMPORTANT This Step by Step guide should be retained after installation Atmos 2 Way Thermostatic Mixer Valve for Round and Square Valve Options...

Страница 2: ...umof5barrunning pressure Themixervalvemustnotbesubjectedto watertemperaturesabove80 C Thismixervalveis alsosuitableforthermalstorage unventedsystems andpumpedgravitysystems IMPORTANT Beforeinstallingw...

Страница 3: ...RTANT This Step by Step guide should be retained after installation Concealing Plate Nut Cover Please make sure ALL components are included before starting the installation Description Quantity MixerV...

Страница 4: ...dent method of isolating the shower should maintenance or servicing be necessary these valves SHOULD NOT restrict the flow DO NOT operate the shower outside the recommended temperatures and pressures...

Страница 5: ...Itis veryimportantthatforuseinanymainspressure systemsanexpansiontankandapressurereducing valvehasbeenfittedtoensurethepressuredoes notexceed5Bar Thisshouldbeconfirmedbytheinstallation engineerorcompe...

Страница 6: ...thesame hotandcoldwaterpressures Ifthisisnotthecasea flowcontroller discwithsmallholes canbefittedto thehigherpressuresupplytothevalve Thisisbest donebytestingeachonetofindoutwhichgivesthe bestresults...

Страница 7: ...pointyoumaywishtofitthepipeworkto oultetspriortoanytiling 5 Thevalveshouldbeattachedfirmlybetween75mm and95mmbelowthefinishedsurfacetoallowthe coverplatetofitneatly usingthetwofixingholeson thevalve P...

Страница 8: ...ntothemixer valveuntilflushwiththetiles Fig5 NOTE Beforeassemblingthevalvecontrolsidentify allthepartsandcheckthatboththeredmarkingson thecontrolshaftofthethermostaticcontrolareinline 11 Fittheon offk...

Страница 9: ...becheckedtoconfirmthe waterisolationperformscorrectly Runthevalveat the38 Cstopposition Checkthewatertemperature 5 Turnoffthefeedofcoldwaterusingtheisolation valve Thewaterflowshouldfalltoaverylowflow...

Страница 10: ...evalveandcleanfilters 4 Showerheadblocked CleanShowerhead 5 Systemnotcapableofsupplyingmultipleoutlet atthesametime Reducesimultaneousdemand Checkstop servicevalvesarefullyopen Checkifenough waterpres...

Страница 11: ...ustomer 2 Thisguaranteeispersonaltotheoriginalpurchaserofthe productandisnottransferable 3 Originalproofofpurchase s mustbeshownforanyclaim underthisguarantee 4 Thisguaranteedoesnotcoveranyproductstha...

Страница 12: ...from this list without prior notice being given 67531KL JULY2016 14 SERVICEPOLICY IntheeventofyouneedingtocontacttheMXGroup CustomerServiceDepartment thefollowing procedureshouldbefollowed 1 Beforetel...

Отзывы: