-15-
TPUT
socket element
threaded sleeve sealing ring pressure screw
Note that the polarity of the connection line matches the terminal tag to avoid
incorrect connection.
notice
Click
!
Click
!
2. Remove the parts of the AC connection plug from the accessory bag. Prepare the pressure
screw, sealing ring, threaded sleeve over the AC cable.
3.Insert the stripped and bared conductors L1,L2,L3,N,PE into the screw terminals with sign L1,L2,L3,
N,PE( ) on the socket element and tighten the screws firmly.
Stranded copper wire
4.Push the threaded sleeve into the socket element; screw the pressure screw tightly onto
the threaded sleeve;
The AC wiring steps:
1. The grid connection is contains using 5 conductors (L1,L2,L3, N, and PE).
Содержание PH50-10000T