© Munters Corporation, August 2018
8
QM1190r7
Installation Instructions
Chapter 2
Figure 7A
Step 6
Work down the sides of the cone, sliding the cone tabs onto the fan until the bottom tab is in place. Keep
pressure on the cone to make sure tabs stay on the fan. Install (6) Truss Head Bolts [B], Washers [C] and
Flange Nuts [D] in the remaining holes in the fan outlet and slots in the cone to finish securing cone to fan.
See Figure 5B and Figure 6.
Tighten all nuts at this time, making sure not to over tighten.
51/55 RC
Cone
Step 7
The snap-in guard has a slight conical shape to it so, when installed the center of the guard should protrude
out slightly.
See Figure 7A.
51/55 RC Cone
Guard
Note:
If installing your existing guard in the new
Polycone, then proceed to Step 9. If installing
the new snap-in guard then proceed to Step 7.
Figure 6
Remaining Holes