5. START-UP AND OPERATION

 

 

 

 

 

 

 

 

 

 

 

Start Up 

 

Before connecting the power supply check the correctness of connection 
of  the  fan  motor  and  the  controllers.  These  connections  should  be 
executed in accordance with their technical documentation. 

 

Before connecting the power supply check whether the mains voltage is 
in accordance with the voltage on the device data plate. 

 

Before  starting  the  device  check  the  correctness  of  connection  of  the 
cooling/heating medium conduits and the tightness of the system. 

 

The  electrical  system  supplying  the  fan  motor  should  be  additionally 
protected  with  a  circuit  breaker  against  the  effects  of  a  possible  short-
circuit in the system.

 

 

Starting the device without connecting the ground conductor is forbidden.

 

 

Operation 

 

The  device  is  designed  for  operation  inside  buildings,  at  temperatures 
above 0

o

C. In low temperatures (below 0ºC) there is a danger of freezing 

of the fluid. 

The  manufacturer  bears  no  responsibility  for  damage  of  the  heat 
exchanger  resulting  from  freezing  of  the  medium  in  the  exchanger.  If 
operation of the device is expected at temperatures lower than 0º, then 
glycol  solution  should  be  used  as  the  cooling/heating  medium,  or 
special  automatic  systems  should  be  used  for  protecting  against 
freezing of the medium in the exchanger. 
 

 

It is forbidden to place any objects on the heater or to hang any objects 
on the connecting stubs. 

 

The  device  must  be  inspected  periodically.  In  the  case  of  incorrect 
operation of the device it should be switched off immediately. 

It  is  forbidden  to  use  a  damaged  device.  The  manufacturer  bears  no 
responsibility for damage resulting from the use of a damaged device. 

 

If  it  is  necessary  to clean the  exchanger,  be careful not to  damage the 
aluminium lamellas. 

 

For the time of performing inspection or cleaning the device, the electrical 
power supply should be disconnected.

 

 

In case water is drained from the device for a longer period of time, the 
exchanger tubes should be emptied with compressed air.

 

 

It  is  not  allowed  to  make  any  modification  to  the  unit.  Any  modification 
results in warranty loss. 
 

Periodic inspections 

To  keep  proper  technical  parameters Salvador Escoda SA  recommends 
periodic service (every 6 months) of fan heaters on behalf of the user. 
During inspections user should: 

 

 

Check  heat  exchanger,  if  is  it  filled  dirty  or  dusty.  If  necessary  -  use 
pressurized air stream to clean the exchanger’s lamellas, 
 

 

 

 

Check fan blades, in case of dirt use damp cloth and remove dirt, 

 

Check bracket installation, 

 

Check  heat  exchanger  and  if  the  hydraulic  connection  has  benn  done 
properly,  

 

Check wires insulation, 

 

Check power supply, 

 

Check medium flow, 

 

Check levelling of the unit. 

 

 

 

 

 

Guidelines for System Connection

 

In the case of devices intended for cooling, control valves cutting off the

  

flow 

 

of 

 

the fluid 

 

through 

 

the 

 

exchanger 

 

should 

 

be

 

used. 

 

In 

 

the

  

absence 

 

of 

 

 

cooling 

 

signal, 

 

the 

 

valve 

 

should 

 

be 

 

closed 

 

to 

 

avoid

  

overcooling the device.

 

The  connection  should  be  executed  in  a  way  which  does  not  induce

  

stresses.

 

It 

 

is 

 

recommended 

 

to 

 

install 

 

vent 

 

valves 

 

at 

 

the 

 

highest 

 

point 

 

of 

 

the

  

system.

 

The  system should  be  executed  so that,  in the case

 

of a failure,  it  is

  

possible to disassemble the device. For this purpose it is best to use

  

shut-off valves near the device.

 

The system with the cooling/heating medium must be

 

protected against

  

an increase of the pressure above the permissible value (1.6 MPa).

 

While screwing exchanger to pipeline - connecting stubs has to be held.

Содержание MUAT-10-FBC

Страница 1: ...English Installation manual MUAT FBC SERIES CL05208 to CL05209 FAN COOLER AND HEATER www mundoclima com MUAT 10 FBC MUAT 20 FBC...

Страница 2: ...tion 3 2 Technical Data 4 3 Installation 6 3 1 Installation bracket 6 3 2 Assembly instructions 6 4 Connection diagrams 7 5 Start Up and Operation 10 6 Service and warranty terms 13 7 Conformity with...

Страница 3: ...ss does not exceed 0 3 g m3 Units are built using copper aluminum and galvanized steel It is prohibited to install units in corrosive environments The devices can not be used in an environment where t...

Страница 4: ...64 1 54 5 42 1 Horizontal range m 18 0 12 7 7 1 Max heating water temperature o C 70 Max operating pressure MPa 1 6 Connection Przy cze 3 4 Installation Indoor Max working temperature o C 55 Device w...

Страница 5: ...re level dB A 67 5 61 1 52 3 Horizontal range m 20 5 16 3 9 7 Max heating water temperature o C 70 Max operating pressure MPa 1 6 Connection 3 4 Installation Indoor Max working temperature o C 55 Devi...

Страница 6: ...ts can be mounted to vertical partitions using rotary console The device should be leveled 3 1 INSTALLATION BRACKET 3 2 ASSEMBLY INSTRUCTIONS Connect pipe for draining condensate If the outer tube fit...

Страница 7: ...Thermostatic mode 1 1 2 3 PG9 PG11 W ires size and type should be chosen by the designer SBV min 2x0 75mm2 FBC FBC max 3 x MUAT 10 FBC max 2 x MUAT 20 FBC SRQ min 3x0 75mm2 MODE FAN 1 2 3 4 5 6 7 8 9...

Страница 8: ...ly turn on the power supply EN It is possible to connect up to 31 modules DRV and control them with one T box controller T BOX B A GND VCC DRV IN A B GND DRV OUT A B GND LOW MED HI FAN 3V N VALVE L1 L...

Страница 9: ...9 EN DRV modules can be connected to the BMS Building Management System WARNING The connection must be carried out with 3 wire recommended UTP to connectors DRV IN BMS GBS...

Страница 10: ...use of a damaged device If it is necessary to clean the exchanger be careful not to damage the aluminium lamellas For the time of performing inspection or cleaning the device the electrical power sup...

Страница 11: ...and its limitation In the case of any irregularities in the device operation please contact the manufacturer s service department The manufacturer bears no responsibility for operating the device in a...

Страница 12: ...used equipment to a designated collection point for proper processing The symbol means at the same time that the equipment was placed on the market after August 13 2005 For information on the collecti...

Страница 13: ...www mundoclima com C N POLES 249 P1 08013 BARCELONA SPAIN 34 93 446 27 80...

Отзывы: