background image

 3

 

 

 

1.

 

APPLICATION

 

 
FBC fan coolers/heaters make up a decentralised cooling/heating system. The air streaming through the heat exchanger is cooled/warmed up. 
Fan coolers/heaters are used for cooling/heating large volume buildings: general, industrial and public buildings etc.  
 
The casing of FBC fan coolers/heaters is made from extended polypropylene EPP. 
Water droplet catcher and condensate tray are made of ABS plastic  
 
The devices are designed for indoor use where maximum air dustiness does not exceed 0,3 g/m

3

. Units are built using copper, aluminum and 

galvanized steel. It is prohibited to install units in corrosive environments. The devices can not be used in an environment where there is oil 
mist. 
 
Water heat exchanger could be supply by water or glycol solution up to 60%. The heat exchanger tubes are made of copper. The fluid 
should not cause corrosion of this material. In particular, the parameters as below should be provided. 
 

Parameter 

Value 

pH 

7,5-9,0 

Content of impurities 

free of sediments/particles 

Total hardness 

[Ca2+, Mg2+]/[HCO3-] > 0.5 

Oil and grease 

<1 mg/l 

Oxygen 

<0.1mg/l 

Bicarbonate, HCO

  

60-300 mg/l 

Ammonium 

< 1.0 mg/L 

Sulphide 

< 0.05 mg/L 

Chloride, Cl  

<100 mg/l 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание MUAT-10-FBC

Страница 1: ...English Installation manual MUAT FBC SERIES CL05208 to CL05209 FAN COOLER AND HEATER www mundoclima com MUAT 10 FBC MUAT 20 FBC...

Страница 2: ...tion 3 2 Technical Data 4 3 Installation 6 3 1 Installation bracket 6 3 2 Assembly instructions 6 4 Connection diagrams 7 5 Start Up and Operation 10 6 Service and warranty terms 13 7 Conformity with...

Страница 3: ...ss does not exceed 0 3 g m3 Units are built using copper aluminum and galvanized steel It is prohibited to install units in corrosive environments The devices can not be used in an environment where t...

Страница 4: ...64 1 54 5 42 1 Horizontal range m 18 0 12 7 7 1 Max heating water temperature o C 70 Max operating pressure MPa 1 6 Connection Przy cze 3 4 Installation Indoor Max working temperature o C 55 Device w...

Страница 5: ...re level dB A 67 5 61 1 52 3 Horizontal range m 20 5 16 3 9 7 Max heating water temperature o C 70 Max operating pressure MPa 1 6 Connection 3 4 Installation Indoor Max working temperature o C 55 Devi...

Страница 6: ...ts can be mounted to vertical partitions using rotary console The device should be leveled 3 1 INSTALLATION BRACKET 3 2 ASSEMBLY INSTRUCTIONS Connect pipe for draining condensate If the outer tube fit...

Страница 7: ...Thermostatic mode 1 1 2 3 PG9 PG11 W ires size and type should be chosen by the designer SBV min 2x0 75mm2 FBC FBC max 3 x MUAT 10 FBC max 2 x MUAT 20 FBC SRQ min 3x0 75mm2 MODE FAN 1 2 3 4 5 6 7 8 9...

Страница 8: ...ly turn on the power supply EN It is possible to connect up to 31 modules DRV and control them with one T box controller T BOX B A GND VCC DRV IN A B GND DRV OUT A B GND LOW MED HI FAN 3V N VALVE L1 L...

Страница 9: ...9 EN DRV modules can be connected to the BMS Building Management System WARNING The connection must be carried out with 3 wire recommended UTP to connectors DRV IN BMS GBS...

Страница 10: ...use of a damaged device If it is necessary to clean the exchanger be careful not to damage the aluminium lamellas For the time of performing inspection or cleaning the device the electrical power sup...

Страница 11: ...and its limitation In the case of any irregularities in the device operation please contact the manufacturer s service department The manufacturer bears no responsibility for operating the device in a...

Страница 12: ...used equipment to a designated collection point for proper processing The symbol means at the same time that the equipment was placed on the market after August 13 2005 For information on the collecti...

Страница 13: ...www mundoclima com C N POLES 249 P1 08013 BARCELONA SPAIN 34 93 446 27 80...

Отзывы: