![Munchkin HIGH EFFICIENCY HEATER with the](http://html1.mh-extra.com/html/munchkin/high-efficiency-heater-with-the-925-controller/high-efficiency-heater-with-the-925-controller_operating-instructions-manual_1856530031.webp)
31
PIPING
Standard Munchkin boiler
Preferred piping (zoning with circulators)
Domestic water heating mode
Munchkin boiler
make-up water
Super Stor
indirect DHW tank
closely
spaced
tees
P2
zone
circulators
T/P
space heating zone circuit
Drawing 2D
purging
valves
NOTES:
1.
This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2.
All closely spaced tees shall be within 4 pipe diameter center to center spacing.
3.
A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream
of all closely spaced tees.
4.
The minimum pipe size for connecting a Super Stor water heater is 1 inch.
5.
The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches.
6.
All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves.
7.
The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119˚F.
8.
Install a minimum of 12 diameters of straight pipe upstream of all circulators.
9.
A purging valve may be used in lieu of the ball valve / hose bib combination shown.
anti-scald
mixing valve
closely
spaced
tees
P1
cold
water
Fig. 5-8
NOTE: FOR VISION PIPING APPLICATIONS, REFER TO THE VISION INSTALLATION PIPING DIAGRAMS.
Содержание HIGH EFFICIENCY HEATER with the "925" Controller
Страница 6: ...GENERAL INFORMATION 6 Figure 1 3 T50M T80M DIMENSIONS...
Страница 7: ...GENERAL INFORMATION 7 DIMENSIONS 80M 140M 199M Figure 1 4 Figure 1 5...
Страница 44: ...MAINTENANCE 44...
Страница 45: ...MAINTENANCE 45...
Страница 46: ...NOTES 46...
Страница 47: ...NOTES 47...