Munchkin HIGH EFFICIENCY HEATER with the

22

PIPING

PART 5.  PIPING  

A. HYDRONIC PIPING WITH CIRCULATORS OR ZONE VALVES 

The Munchkin is designed to function in a closed loop 15 PSI System. To assure you that you have
adequate pressure in the system, we have installed in the outlet manifold, a pressure switch that will
not let the Munchkin operate without a minimum of 10 PSI water pressure. This assures you that if the
system does have leak, the Munchkin will lock out (PRO on the display) before it damages the Stainless
Steel Heat Exchanger. We have also included a Temperature and Pressure gauge which should be
located on the Munchkin outlet to monitor the system pressure and outlet temperature from the
Munchkin. It is important to note that the Munchkin has a minimal amount of pressure drop and must
be figured in when sizing the circulators. Each Munchkin installation must have an Air Elimination
device which will remove air from the system. Install the Munchkin so the gas ignition system
components are protected from water (dripping, spraying, etc.) during appliance operation for basic
service of circulator replacement, valves and other. Observe minimum 1” clearance around all un-
insulated hot water pipes when openings around pipes are not protected by non-combustible
materials. On a Munchkin installed above radiation level, some states and local codes require a low
water cut off device at the time of installation. If the Munchkin supplies hot water to heating coils in air
handler units, flow control valves or other devices must be installed to prevent gravity circulation of
heater water in the coils during the cooling cycle. Chilled Water Medium must be piped in parallel with
the heater. Freeze Protection for new or existing systems must use glycol that is specially formulated
for this purpose. It includes inhibitors, which prevent the glycol from attacking the metallic system
components. Make certain that the system fluid is checked for the correct glycol concentration and
inhibitor level. The system should be tested at least once a year and as recommend by the producer
of the glycol solution. Allowance should be made for the expansion of the glycol solution in the system
piping. Example 50% by volume solution expands 4.8% in volume for the temperature increase from
32 F to 180 F, while water expands 3% with the same temperature rise.  

Basic steps are listed below, with Illustration, which will guide you through the installation of the
Munchkin. 

1. Connect the system return marked “Heater In”, make sure to install with pipe sealant com-

pound. Threaded connections are 1 ¼” NPT Brass nipples located on the left hand side of
unit. 

2. Connect the system supply marked “Heater Out”, make sure to install with pipe sealant com-

pound. Threaded connections are 1 ¼” NPT Brass nipples located on the left hand side of the
unit. 

3. Install Purge and Balance Valve or shut off valve and drain on system return to purge air out

of each zone. 

4. Install a Back Flow preventor on the Cold Feed Make-Up Water line.
5. Install a Pressure Reducing Valve on the Cold Feed Make-Up Water line, (15 PSI nominal on

the system return). Check Temperature and Pressure Gauge which should read minimum
pressure of 12 PSI. 

6. Install a circulator on system supply. Make sure the circulator is properly sized for the system

and friction loss.

7. Install an Expansion Tank on the system supply. Consult the tank manufacturer’s instruction

for specific information relating to tank installation. Size the expansion tank for the required
system volume and capacity. 

CAUTION  

The Munchkin should not be operated as a potable Hot Water Heater. It should not be
used as a direct Hot Water Heating Device.

Содержание HIGH EFFICIENCY HEATER with the "925" Controller

Страница 1: ...eighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency...

Страница 2: ...HEATER AND PRESSURE VESSEL CODE Section IV ALONG WITH CSD1 THE HEATER GAS PIPING WATER PIPING VENTING AND ELECTRICAL MUST BE INSTALLED BY TRAINED QUALIFIED PERSONNEL FAMILIAR WITH INSTALLATION PRACTI...

Страница 3: ...ng with Circulators or Zone Valves 22 B Circulator Sizing 23 C Fill and Purge Heating System 24 D Piping Illustrations 25 PART 6 34 thru 37 START UP PROCEDURES A Sequence of operation 34 B Items to be...

Страница 4: ...seconds to pre purge the system before starting the Munchkin The Munchkin controller will now start to modulate the pre mix burner based on analyzing the return temperature supply water temperature an...

Страница 5: ...GENERAL INFORMATION 5 Figure 1 1 NOTE The Munchkin is rated at zero clearance to combustibles 80M 140M 199M T50M T80M RECOMMENDED SERVICE CLEARANCES Figure 1 2...

Страница 6: ...GENERAL INFORMATION 6 Figure 1 3 T50M T80M DIMENSIONS...

Страница 7: ...GENERAL INFORMATION 7 DIMENSIONS 80M 140M 199M Figure 1 4 Figure 1 5...

Страница 8: ...certified for use on combustible floors 2 Refer to Figure 1 1 and Figure 1 2 for the recommended clearance to allow for rea sonable access to the boiler Local codes or special conditions may require...

Страница 9: ...r your convenience we have labeled all the wires that need to be connected to operate the Munchkin CAUTION The Munchkin is certified as an indoor appliance Do not install the Munchkin outdoors or loca...

Страница 10: ...n should now be reading the outlet temperature Note see Part 6 Startup Procedure section in the manual to change the temperature setting or run the heater CAUTION Electrical wiring on the Incoming Pow...

Страница 11: ...R FIRE AND COULD DAMAGE THE CONTROL O R A N G E B R O W N G R E E N Figure 2 1 Connection Wiring Directly to Central Heating Circulator Figure 2 2 Connection Wiring without Wiring Central Heating Circ...

Страница 12: ...rom the gas line In order to do this you must shut the gas off using factory and field installed gas cocks following the lighting instructions in Part 6 Section B This will prevent high pressure Failu...

Страница 13: ...inimum of 10 feet from the Munchkin It is very important that the gas line is properly purged by the gas supplier or utility Failure to properly purge the lines or improper line sizing will result in...

Страница 14: ...ombustibles Note For Concrete construction or to meet certain fire codes exhaust and inlet piping at the wall penetration to the Munchkin must be CPVC Schedule 40 or 80 to meet local fire codes The ba...

Страница 15: ...Never vent over or under a window or over a doorway where the exhaust plume or conden sation liquid will cause obtrusive or dangerous conditions Or refer to National Fuel Gas Code CAN B149 3 Never ins...

Страница 16: ...CREENS FROM THE PROVIDED INLET TEE AND INSTALL THEM IN THE INLET SOCKET AND OUTLET SOCKET Y TEE CONNECTION OF THE KIT PRIOR TO INSTALLING THE SCHEDULE 40 PIPE AND GLUING VENTING 12 in minimum Forced a...

Страница 17: ...ed combined length of pipe on the inlet and exhaust must not exceed 125 equivalent feet total Example Installation requires the following material for both the inlet and exhaust piping when extending...

Страница 18: ...7 Any improper operation of the common venting system should be corrected so the installa tion conforms with the National Fuel Gas Code ANSI Z223 1 When resizing any portion of the common venting sys...

Страница 19: ...hed a minimum of a per foot back to the heater to allow drainage of condensate Figure 4 1 IMPORTANT NOTE All vent pipes must be glued prop erly supported and the exhaust must be pitched a mini mum of...

Страница 20: ...ust must be pitched a minimum of a per foot back to the heater to allow drainage of condensate Figure 4 3 IMPORTANT NOTE All vent pipes must be glued properly supported and the exhaust must be pitched...

Страница 21: ...ched a minimum of a per foot back to the heater to allow drainage of condensate Figure 4 5 IMPORTANT NOTE All vent pipes must be glued properly supported and the exhaust must be pitched a minimum of a...

Страница 22: ...use glycol that is specially formulated for this purpose It includes inhibitors which prevent the glycol from attacking the metallic system components Make certain that the system fluid is checked for...

Страница 23: ...g illustrations included in this section Figs 5 3 to 5 11 for suggested guidelines in piping the Munchkin heater with either zone valves or circulator pumps Please note that these illustrations are me...

Страница 24: ...ested at least once a year and as recommended by the glycol manufacturer 3 Anti freeze solutions expand more than water For example a 50 by volume solution expands 4 8 in volume for a temperature incr...

Страница 25: ...valve air separator backflow preventer diaphragm type expansion tank pressure reducing valve diff pressure bypass anti scald rated mixing valve pressure gauge 4 way motorized mixing valve 3 way motori...

Страница 26: ...140M 5 gpm Munchkin model 199M 7 gpm 3 The minimum pipe size for connecting a Super Stor water heater is 1 inch 4 The minimum pipe size for connecting a Munchkin boiler is 1 25 inches 5 All pumps are...

Страница 27: ...gpm Munchkin model 80M 3 gpm Munchkin model 140M 5 gpm Munchkin model 199M 7 gpm 3 The minimum pipe size for connecting a Super Stor water heater is 1 inch 4 The minimum pipe size for connecting a Mun...

Страница 28: ...for connecting a Munchkin boiler is 1 25 inches 5 All pumps are shown with isolation flanges The alternative is standard flanges with full port ball valves 6 The anti scald mixing valve is recommended...

Страница 29: ...3 The minimum pipe size for connecting a Super Stor water heater is 1 inch 4 The minimum pipe size for connecting a Munchkin boiler is 1 25 inches 5 All pumps are shown with isolation flanges The alte...

Страница 30: ...pe size for connecting a Munchkin boiler shall be 1 25 inches 6 All pumps are shown with isolation flanges The alternative is standard flanges with full port ball valves 7 The anti scald mixing valve...

Страница 31: ...stalled upstream and downstream of all closely spaced tees 4 The minimum pipe size for connecting a Super Stor water heater is 1 inch 5 The minimum pipe size for connecting a Munchkin boiler shall be...

Страница 32: ...ize for connecting a Munchkin boiler shall be 1 25 inches 6 All pumps are shown with isolation flanges The alternative is standard flanges with full port ball valves 7 The anti scald mixing valve is r...

Страница 33: ...pe size for connecting a Munchkin boiler shall be 1 25 inches 6 All pumps are shown with isolation flanges The alternative is standard flanges with full port ball valves 7 The anti scald mixing valve...

Страница 34: ...l enters an idle state while continuing to moni tor temperature and the state of other system devices If a call for heat is received the con trol will automatically return to step 2 in sequence and re...

Страница 35: ...ian Force or attempted repair may result in a fire or explosion 4 Do not use this appliance if any part has been under water Immediately call a qualified serv ice technician to inspect the appliance a...

Страница 36: ...he burn er will not start until the outlet temperature of the system falls below 159 F degrees 180 20 F 160 F To adjust press either S1 Decrease Value or S2 Increase Value Ranges 5 F to 30 F Press the...

Страница 37: ...mode stops automatically To exit Test Mode press S1 and S2 key together for 1 second H TO TURN OFF GAS TO APPLIANCE 1 Set the thermostat to lowest setting 2 Turn off all electric power to the applian...

Страница 38: ...e controller will illuminate the red fault indication light and display a fault code in the format Example F00 on the display module 2 Note the fault code and refer to Table 7 2 for an explanation of...

Страница 39: ...c o l b e u l f y n a k c e h C 0 1 F r e l i o b e h T l a n g i S e m a l F f o s s o L e h t e r o f e b s e m i t 4 t h g i l e r l l i w t u o k c o l s i h t o t n i s e o g l o r t n o c n o i...

Страница 40: ...t Temperature F Resistance ohms 32 32550 41 25340 50 19870 59 15700 68 12490 77 10000 86 8059 95 6535 104 5330 113 4372 122 3605 131 2989 140 2490 149 2084 158 1753 167 1481 176 1256 185 1070 194 915...

Страница 41: ...check burner for deterioration If deterioration is observed replace burner System Water Pressure check pressure regulator and system pressure Check system for air which will create noise Open air vent...

Страница 42: ...y buildup then vacuum the debris from the coils 4 Spray the coils with clear water making sure to confine the spray to the area being cleaned Try to avoid getting the back ceramic wall of the unit wet...

Страница 43: ...YOUT Fig 8 1 There is a spare 6 3 amp slow blow fuse included on the control cover HTP p n 7250 378 or you may purchase it from Radio Shack p n 270 1068 Caution Do not replace with any amperage other...

Страница 44: ...MAINTENANCE 44...

Страница 45: ...MAINTENANCE 45...

Страница 46: ...NOTES 46...

Страница 47: ...NOTES 47...

Страница 48: ...SuperStor Ultra SuperStor Voyager Voyager Sanitizer and Everlast are registered trademarks of Heat Transfer Products Inc Munchkin R1 2004 Heat Transfer Products Inc LP 61 REV 1 17 05...

Отзывы: