background image

1.  Basic information

Target group for these installation instructions

These assembly instructions are aimed at landscape gardeners, carpenters, joiners and experienced  

DIY enthusiasts. 
Safety obligations when using these installation instructions

Please read the complete assembly instructions carefully before starting the installation. Each person who installs

LIGNODUR terrafina® refugio 2.0 needs to have taken note and understood the entire contents of these assembly 

instructions. Always keep these assembly instructions always close at hand and safe.

 

Use as directed

LIGNODUR terrafina® refugio 2.0 has been developed for use as a screen. Any other use is considered improper 

use. All liability is excluded for damage resulting from improper use.

Before use, please check whether LIGNODUR terrafina® refugio 2.0 is suitable for the intended use. 

Use as directed also includes compliance with all information in these assembly instructions, especially compli-

ance with the safety instructions and the local building regulation.

 

Important notes

LIGNODUR terrafina® refugio 2.0 panels can be sawn with conventional woodworking tools.

Due to the high wood composition, LIGNODUR terrafina® is subject to natural expansion. 

This is why it is important to allow for expansion in the posts (see point 5.1.). Not observing this point may lead to 

the material warping. In such cases, warranty claims can no longer be accepted. Möller GmbH & Co. KG does not 

assume any liability for damage arising from improper use or incorrect assembly.

Check the components that are used for possible faults before mounting. If there are obvious faults

or if you establish damage, the components must not be installed. In this case, contact your supplier.

 

Additional rules and regulations

In addition to the specifications stated in these assembly instructions, the applicable accident prevention regula-

tions related to the workplace and other national and local regulations must be followed. Furthermore, the safety 

regulations and standards of the respective country where the system is used must be adhered to.

 

Technical questions?

These assembly instructions refer to standard assemblies. Due to the variety of design options not all details can 

be displayed here. If you have further questions or require technical advice, please contact our service team using 

the following e-mail address: [email protected].

 

Validity

The assembly instructions have been written on the basis of today‘s technical knowledge and can be adapted  

to technical progress at any time without notification. Please check if you have the latest version. An updated 

version is available at www.terrafina.de.

Structural requirements

In order to be able to accommodate the wind loads impacting the system, the foundations must correspond to 

the load at the installation site and the soil conditions. Because local conditions are different, we are not able to 

provide general specifications for the specific planned installation. We therefore recommend that you seek advice 

from an architect or structural engineers when planning the size of the foundation and any necessary reinforce-

ments. The foundations must always be kept free from frost.

The concrete that is used must correspond with the quality class C20/25 in accordance with DIN EN 206-1 / DIN 

1045-2. Adhesive anchors should be exclusively used for attaching the supports to the screw on elements. 

For example, Fischer Highbond-System FHB II or equivalent. Minimum requirement: strength class A4-70, stainless steel, 

min. M12, anchor depth min. 120mm. Attention should be paid to the manufacturer’s instructions for working with the 

products.

Содержание LIGNODUR terrafina refugio 2.0

Страница 1: ...Screen refugio 2 0 LIGNODUR Assembly instructions LIGNODUR terrafina Screen refugio 2 0 www terrafina de M A D E I N GERMANY...

Страница 2: ...tional rules and regulations In addition to the specifications stated in these assembly instructions the applicable accident prevention regula tions related to the workplace and other national and loc...

Страница 3: ...ncreting start middle post overall height 758 mm height above foundation 450 mm depth of concrete 308 mm Post supports for concreting corner post overall height 958 mm height above foundation 650 mm d...

Страница 4: ...distance of the outer borehole to the edge of the foundation must be at least 50mm at reduced load and 180mm at maximum load When tightening the screws ensure the vertical orientation of the post supp...

Страница 5: ...e profiles can be installed at this height For other heights refer to the following table Screen refugio 2 0 LIGNODUR 3 5 1 3 5 2 3 4 Alignment of the post supports Positioning and distancing 3 4 An a...

Страница 6: ...4 3 Fixing the posts The filling profiles are inserted into the joints When using a joint covering see Installation of the joint covering the filling profile must be shortened to the dimensions indic...

Страница 7: ...end 8 mm below the top edge of the posts Please fix the post cap with a mounting adhesive not supplied 5 1 5 2 5 3 1 5 3 2 5 3 3 5 1 Checking the clearance Always start the assembly process with a fra...

Страница 8: ...2993 0 Fax 49 0 291 2993 99 info moeller profilsysteme de www moeller profilsysteme de M A D E I N GERMANY www terrafina de PEFC 04 31 1955 Authorised Dealer 6 6 Wall assembly 6 1 The post is attached...

Отзывы: