background image

Screen

refugio 2.0

LIGNODUR

Assembly instructions

LIGNODUR terrafina® Screen 

refugio 2.0

w

w

w

.t

err

afina.de

M A D E   I N

GERMANY

Содержание LIGNODUR terrafina refugio 2.0

Страница 1: ...Screen refugio 2 0 LIGNODUR Assembly instructions LIGNODUR terrafina Screen refugio 2 0 www terrafina de M A D E I N GERMANY...

Страница 2: ...tional rules and regulations In addition to the specifications stated in these assembly instructions the applicable accident prevention regula tions related to the workplace and other national and loc...

Страница 3: ...ncreting start middle post overall height 758 mm height above foundation 450 mm depth of concrete 308 mm Post supports for concreting corner post overall height 958 mm height above foundation 650 mm d...

Страница 4: ...distance of the outer borehole to the edge of the foundation must be at least 50mm at reduced load and 180mm at maximum load When tightening the screws ensure the vertical orientation of the post supp...

Страница 5: ...e profiles can be installed at this height For other heights refer to the following table Screen refugio 2 0 LIGNODUR 3 5 1 3 5 2 3 4 Alignment of the post supports Positioning and distancing 3 4 An a...

Страница 6: ...4 3 Fixing the posts The filling profiles are inserted into the joints When using a joint covering see Installation of the joint covering the filling profile must be shortened to the dimensions indic...

Страница 7: ...end 8 mm below the top edge of the posts Please fix the post cap with a mounting adhesive not supplied 5 1 5 2 5 3 1 5 3 2 5 3 3 5 1 Checking the clearance Always start the assembly process with a fra...

Страница 8: ...2993 0 Fax 49 0 291 2993 99 info moeller profilsysteme de www moeller profilsysteme de M A D E I N GERMANY www terrafina de PEFC 04 31 1955 Authorised Dealer 6 6 Wall assembly 6 1 The post is attached...

Отзывы: