background image

4.  Assembly of the posts

The position of the post supports

is fixed with the help of lateral 

struts (not supplied) and com-

pacted using concrete.

In performing this, ensure that the 

post supports are vertical.

3.5 Filling in the concrete / Vertically oriented assembly

4.1 Post length

The standard height of the post is 1860 mm. 10 panels and 2 frame profiles  

can be installed at this height. For other heights, refer to the following table:

Screen

refugio 2.0

LIGNODUR

3.5.1

3.5.2

3.4 Alignment of the post supports, Positioning and distancing

3.4

An additional frame profile can be 

used for all heights.

This increases the length of the

filling profiles by around 3cm.  

The covering joint can be omitted.

Necessary 

post height (cm)

Filling profile (cm)

Number of  

frame profiles

Number of 

panels

186

180

2

10

169

163

2

9

151

145

2

8

134

128

2

7

116

110

2

6

99

93

2

5

shortened posts

Standard version

Содержание LIGNODUR terrafina refugio 2.0

Страница 1: ...Screen refugio 2 0 LIGNODUR Assembly instructions LIGNODUR terrafina Screen refugio 2 0 www terrafina de M A D E I N GERMANY...

Страница 2: ...tional rules and regulations In addition to the specifications stated in these assembly instructions the applicable accident prevention regula tions related to the workplace and other national and loc...

Страница 3: ...ncreting start middle post overall height 758 mm height above foundation 450 mm depth of concrete 308 mm Post supports for concreting corner post overall height 958 mm height above foundation 650 mm d...

Страница 4: ...distance of the outer borehole to the edge of the foundation must be at least 50mm at reduced load and 180mm at maximum load When tightening the screws ensure the vertical orientation of the post supp...

Страница 5: ...e profiles can be installed at this height For other heights refer to the following table Screen refugio 2 0 LIGNODUR 3 5 1 3 5 2 3 4 Alignment of the post supports Positioning and distancing 3 4 An a...

Страница 6: ...4 3 Fixing the posts The filling profiles are inserted into the joints When using a joint covering see Installation of the joint covering the filling profile must be shortened to the dimensions indic...

Страница 7: ...end 8 mm below the top edge of the posts Please fix the post cap with a mounting adhesive not supplied 5 1 5 2 5 3 1 5 3 2 5 3 3 5 1 Checking the clearance Always start the assembly process with a fra...

Страница 8: ...2993 0 Fax 49 0 291 2993 99 info moeller profilsysteme de www moeller profilsysteme de M A D E I N GERMANY www terrafina de PEFC 04 31 1955 Authorised Dealer 6 6 Wall assembly 6 1 The post is attached...

Отзывы: