50
Operation
3.3
Putting the engine into operation after scheduled
out-of-service-period
Preconditions
• Engine is stopped and starting disabled.
Putting the engine into operation
Item
Task
Lube oil system
Check oil level (
Cooling system
Check engine coolant level (
Check charge-air coolant level (
Cooling system
Preheat coolant with preheating unit.
Fuel prefilter
Drain (
Monitoring equipment
Carry out lamp test (see manufacturer’s documentation).
Engine/generator control system
Switch ON;
Select operating mode, e.g. MANUAL OPERATION,
AUTOMATIC OPERATION.
MS15009/00E 06-09
© MTU
Содержание Detroit Diesel 12 V 2000 P62
Страница 18: ...14 Safety MS15009 00E 06 09 MTU...
Страница 62: ...58 Operation MS15009 00E 06 09 MTU...
Страница 136: ...132 Task Description Left side 1 Engine coolant drain plug 2 Engine coolant drain plug MS15009 00E 06 09 MTU...
Страница 137: ...Task Description 133 Right side 1 Engine oil drain plug heat exchanger 2 Engine coolant drain plug MS15009 00E 06 09 MTU...
Страница 188: ...184 Engine Governor Assignment and Circuitry MS15009 00E 06 09 MTU...
Страница 196: ...192 Special Tools Part No Designation Use Qty F30025897 Socket wrench 1 MS15009 00E 06 09 MTU...
Страница 198: ...194 Special Tools MS15009 00E 06 09 MTU...
Страница 199: ...Annex 195 9 Annex 9 1 Manufacturer s documentation See Manufacturer s documentation MS15009 00E 06 09 MTU...
Страница 204: ...200 Annex MS15009 00E 06 09 MTU...
Страница 208: ......