94
Task Description
Evaluation of findings and further measures
The findings in the start phase of oxidation discoloration and heat discoloration are similar. Thorough investigation
and compliance with the above evaluation criteria allows a definite evaluation. To avoid unnecessary disassembly
work, it is recommended that another inspection be carried out after further operation of the engine.
MS15009/00E 06-09
© MTU
Содержание Detroit Diesel 12 V 2000 P62
Страница 18: ...14 Safety MS15009 00E 06 09 MTU...
Страница 62: ...58 Operation MS15009 00E 06 09 MTU...
Страница 136: ...132 Task Description Left side 1 Engine coolant drain plug 2 Engine coolant drain plug MS15009 00E 06 09 MTU...
Страница 137: ...Task Description 133 Right side 1 Engine oil drain plug heat exchanger 2 Engine coolant drain plug MS15009 00E 06 09 MTU...
Страница 188: ...184 Engine Governor Assignment and Circuitry MS15009 00E 06 09 MTU...
Страница 196: ...192 Special Tools Part No Designation Use Qty F30025897 Socket wrench 1 MS15009 00E 06 09 MTU...
Страница 198: ...194 Special Tools MS15009 00E 06 09 MTU...
Страница 199: ...Annex 195 9 Annex 9 1 Manufacturer s documentation See Manufacturer s documentation MS15009 00E 06 09 MTU...
Страница 204: ...200 Annex MS15009 00E 06 09 MTU...
Страница 208: ......