5.
Open the drainage point on the main PTO
end of the crankcase, on the left or right
side (arrowed) and drain off the engine
coolant.
6.
Close off all open drain points.
7.
Place pressure cap on filler neck and close.
Concluding operations
u
Switch on preheater.
M015695/03E 2013-03
| Task Description | 125
TIM-ID: 0000006739 - 006