USER MANAUL
MGA
prime Q
MRU GmbH, D-74172 Neckarsulm
74 /
117
►
Press OK.
►
Wait until the warm-up phase is completed.
NOTE
Please note that no leak test can be performed with a
connected Acid Dosing Unit APE. The Acid Dosing Unit
APE is connected to the analyser via a connecting hose
with two couplings
►
Remove the two couplings from the analyser.
Leak test is now available.
►
Press START LEAK TEST
A message appears.
►
Confirm with YES, that the APE tubes are removed.
►
Seal the gas port.