USER MANAUL
MGA
prime Q
MRU GmbH, D-74172 Neckarsulm
51 /
117
NOTE
Always connect the collection container.
Please note that the volume of the supplied collecting
container is sufficient for 2 hours of measuring opera-
tion.
►
Empty the collecting container after two hours of
measuring operation.
►
Dispose acid condensate and phosphoric acid in
accordance with national and, if necessary, local dis-
posal guidelines.
►
Plug the coupling of the connecting hose to the acid tank into the
connection nozzle of the Acid Dosing Unit APE (Input 10 % phos-
phoric acid).
NOTE
You do not have to pay attention to any special
arrangement of the couplings between the Acid
Dosing Unit APE and the analyser.
Make sure that the hose connectors click into place
audibly.
►
Plug the cable socket of the mains cable into the Acid Dosing Unit
APE (Main).
►
Plug the power cord into the socket.
At the end of the zero-point measurement, phosphoric acid (10
%) will be injected.
The control lamp lights up green as soon as phosphoric acid
(10 %) will be injected. The control of the acid dosing unit APE be-
gins 40 minutes after the analyser is started.