6.1.4

 

Turn

 

on

 

the

 

power

 

switch,

 

press

 

"run",

 

slowly

 

turn

 

the

 

knob

 

switch

 

to

 

maximum,

 

(

MIXP

 

adjust

 

the

 

frequency

 

of

 

the

 

inverter),

 

observe

 

whether

 

the

 

machine

 

is

 

running

 

smoothly.

6.1.5

 

Operate

 

the

 

machine

 

for

 

at

 

least

 

one

 

half

 

hour

 

under

 

no-load

 

conditions

 

to

 

ensure

 

whether

 

exist

 

abnormal

 

heat,

 

vibration,

 

and

 

abnormal

 

noise.

6.2

 

Load

 

test

 

run

6.2.1

 

Only

 

after

 

right

 

no-load

 

trial

 

operation

 

can

 

guarantee

 

the

 

normal

 

test

 

run

 

of

 

the

 

loading

6.2.2

 

The

 

machine

 

can

 

be

 

run

 

several

 

times

 

without

 

load

 

so

 

that

 

the

 

operator

 

can

 

become

 

familiar

 

with

 

the

 

machine's

 

on/off

 

button

 

position

 

and

 

start

 

and

 

stop

 

sequence.

6.2.3

 

In

 

an

 

emergency,

 

immediately

 

press

 

the

 

"stop"

 

button

 

and

 

cut

 

off

 

the

 

power.

6.3

 

Commissioning

 

Precaution

6.3.1

 

Regardless

 

of

 

whether

 

it

 

is

 

an

 

empty

 

test

 

run

 

or

 

a

 

load

 

test

 

run,

 

someone

 

must

 

be

 

on

 

duty

 

and

 

must

 

not

 

be

 

far

 

away

 

from

 

the

 

control

 

panel.

6.3.2

 

Only

 

trained

 

professionals

 

are

 

allowed

 

to

 

operate

 

the

 

equipment.

6.3.3

 

During

 

the

 

first

 

hour

 

of

 

operation,

 

special

 

attention

 

was

 

paid

 

to

 

abnormalities

 

(such

 

as

 

abnormal

 

noise,

 

vibration,

 

large

 

temperature

 

rise,

 

etc.)

 

whether

 

be

 

existed.

7.

 

MIXP-

series

 

mixer

 

operating

 

procedures

7.1 Check machine

The equipment is installed on the site and the adjustment is parallel. Put flexible Barrel rotation as
standard. The mixer barrel is a rotating part and the staff must not approch the machine during the
operation to avoid bumps and scratches.

7.2 Get the materials ready

Prepare various materials that need to be mixed.

Содержание MIXP Series

Страница 1: ...1 MIXP SERIES Table top Double Movement Mixer Operation manual PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION 3 Hagavish st Israel 58817 Tel 972 3 5595252 Fax 972 3 5594529 mrc mrclab com MRC 3 21...

Страница 2: ...e 5 3 2 Keep machine 5 4 Installation procedures 5 5 Safe operation 5 6 Debugging 5 6 1 No load test run 5 6 2 Load test run 5 6 3 Commissioning Precaution 6 7 MIXP series mixer operating procedures 6...

Страница 3: ...ovement Mixer combines the double movement mixing concept with the complex mixing of experimental tasks Only need one host machine By changing the barrels with different volumes and supporting spiral...

Страница 4: ...R Min Motor Power KW Size L W H mm Weight Kg MIXP X 2 5 5 0 35 0 52 0 25 540 325 390 30 2 4 Scope of application 2 4 1 Suitable for the mixing of dry powder or semi dry powder materials commonly used...

Страница 5: ...e the installation is relatively simple just need place it flat on the table 5 Safe operation 5 1 Strictly prohibited touch the drum and other rotating parts while the equipment is running 5 2 When se...

Страница 6: ...ely press the stop button and cut off the power 6 3 Commissioning Precaution 6 3 1 Regardless of whether it is an empty test run or a load test run someone must be on duty and must not be far away fro...

Страница 7: ...above figure Put the material into the bucket the best loading capacity is 70 80 of the bucket volume For this parts we will send video for your reference by mail 7 4 Install Barrel lid Install the li...

Страница 8: ...adest can be cleaned with a brush or compressed air jet gun 7 8 3 Protective glasses must be worn when using compressed air to purge the equipment so as not to injure the eyes by the particles rolled...

Страница 9: ...t is in operation please inform the manufacturer to adjust or replace the seal 8 3 Reducer Reducer maintenance replace the new engine oil after 100 hours the first cumulative use and then replace it e...

Отзывы: