5 Mounting
Maschinenfabrik Reinhausen GmbH 2019
30
6107891/02 EN
ECOTAP
®
VPD
®
2. Clean sealing surfaces on sealing module and underside of transformer
cover. Insert O-ring supplied in sealing module.
Figure 10: O-ring gasket
3.
CAUTION!
Gradually tighten screws crosswise as described below
without warping or deforming. Improper screw connection will result in
damage to the on-load tap-changer.
4. Guide on-load tap-changer from below through the opening in the trans-
former cover.
5. Evenly tighten screws crosswise by hand. Tighten screws crosswise with
a pre-tightening torque of 9 Nm.
6. Check seat of flange and seal for regularity.
Содержание ECOTAP VPD I
Страница 1: ...On Load Tap Changer ECOTAP VPD Operating Instructions 6107891 02 EN ...
Страница 89: ...12 3 High voltage connection diagrams 89 12 3 High voltage connection diagrams ...
Страница 96: ......
Страница 97: ......