UNI MP100 User’s Guide
15
9.
“Save” stores the current Docking Box configuration file to the PC.
10.
“Load” calls up a stored Docking Box configuration file from the PC to mPower Suite.
11.
To update the Docking Box firmware, select “Firmware Upgrade”. The firmware must first
be downloaded to the PC from the mPower website www.mPowerinc.com.
6.2
Procedures for UNI Calibration on Docking Box
1.
Connect gas and regulator to the quick-connect in the Cal gas inlet port of the Docking Box
using 6-mm or ¼-inch o.d. tubing
2.
If the ambient air is not free of detectable compounds, connect the air inlet to a fresh air
source.
3.
If desired, connect tubing to the gas outlet to exhaust away from the operator breathing area.
Docking Box Components
Calibration Gas Connections
4.
Place the instrument face-down into the cradle.
5.
If the Status LED
[4]
is off, press Cal/
[5]
until the LED turns green.
6.
Push Cal
[5]
to initiate calibration or Bump
[6]
to run a bump test. The LED should blink
green for about 100 s during calibration or 25 s during a bump test.
7.
If the calibration or bump is successful, the Unit LED
[3]
will be green, otherwise red.
8.
Up to 2000 Cal or Bump reports will be saved in the
internal storage of the Docking Box.
9.
To power off, hold the Cal button until the status LED turns off.
Summary of Visual and Audio Alarm Indications