background image

 

 

SERVICE MANUAL 

MOYNO

®

 2000 PUMPS

 

G2 Open Throat Models 

G3 Bridge Breaker Models

 

1-1. INTRODUCTION 

 

 
1-2. GENERAL 

 

The Moyno

®

 2000 Pump is the culmination of over  

50 years of experience in manufacturing and marketing  
fluids handling equipment. This rugged pump has 

 

been engineered to be the most reliable product ever sold 
under the Moyno name. The pump has been painstakingly 
tested to assure consistent performance in the 

 

most difficult of applications. It represents the next genera-
tion of the world’s most versatile pump. 

 
The Moyno 2000 Pump is a progressing cavity pump. The 

pumping action is created by a single helical rotor rolling 
eccentrically in the double helix of the stator. The rotor in 
conjunction with the stator forms a series of sealed cavities 
180 degrees apart. As the rotor turns, the cavities progress 
from the suction to the discharge. As one cavity diminishes, 
the opposing cavity increases at exactly the same rate. Thus 
the sum of the two discharges is a constant volume. The 
result is a pulsation-free positive displacement flow utilizing 
no valves. 

 

1.3. NAMEPLATE DATA 

 
The pump nameplate, located on the bearing housing, 

contains important information relating to the operation and 
servicing of the pump. This information includes the direction 
of rotation arrow and the pump model and serial numbers 
(see fig. 1-1). 

 
The pump model number must be used for reference 

when ordering spare parts. To simplify this procedure, the 
model number for your pump has been recorded on the 
nameplate drawing on the front cover of this manual. Please 
carefully file this manual for further reference. 

 

1.4. Pump Rotation. 

The direction of rotation is indicated by 

a rotation arrow on the nameplate. Rotation of Moyno 2000 
G2/G3

 

pumps is always clockwise, when viewed from the 

driven end of the pump. 

 

1-5. Model Number. 

The pump model number consists of 

three component parts: Frame Designations, Type Designa-
tions and a Trim Code. A typical model number for example, 
might be 2G065G2 CDQ AAA, as shown on the nameplate 
in fig. 1-1. 

 

1-6. Frame Designation.

 The Moyno 2000 is modular in 

concept allowing for optimal matching of drive ends and 

 

Figure 1-1. Typical nameplate showing rotation arrow,  

model and manufacturing serial numbers. 

 

pump elements (rotor and stator) to meet the requirements 
of the application. The seven or more characters in the frame 
designation describe the particular combination of drive end 
and pump elements, as well as other construction details of 
your pump. 

 
The first character in the frame designation, always  

a number, indicates the number of stages of the pumping 
elements. 

 
The second character is always a letter (E through K) and  

indicates the drive end size. 

 
The third, fourth and fifth characters are numbers indicat-

ing the theoretical capacity of the pumping elements per 100 
revolutions. 

 
The sixth character represents the type of universal joint 

utilized. The letter G indicates a gear type joint. Other con-
figurations may be indicated by the letters P or F. 

 
The seventh character, a number, indicates the type of 

suction housing. Flanged suction port pumps are designated 
by the numeral “1,” open throat pumps by the numeral “2” 
and open throat pumps with a bridge breaker option by the 
numeral “3.” 

 

1-7. Type 

Designation.

 Following the Frame Designa-

tion is the Type Designation, a series of three letters describ-
ing the materials from which the pump is constructed. 

Section: 

MOYNO

®

 

2000 PUMPS 

Page: 1 
Date: October 2005 

Содержание Version 3

Страница 1: ......

Страница 2: ...MOYNO 2000 Pumps G2 Open Throat Models G3 Bridge Breaker Models Version 3 Models SERVICE MANUAL ...

Страница 3: ... Rotor 8 4 31 Stator 8 4 32 All Other Parts 8 4 33 ASSEMBLY OF G2 OPEN THROAT PUMP 8 4 34 Lubrication During Assembly 8 4 35 Packing Installation 8 4 36 Bearing Housing Suction Housing Assembly 9 4 37 Bearing Drive Shaft Assembly 9 4 38 Rotor Stator Assembly 9 4 39 Rotor Gear Joint and Conveyor Assembly 10 4 40 Drive End Gear Joint Assembly 11 4 41 Stator Support Discharge Assembly 11 4 42 Final A...

Страница 4: ...ation The direction of rotation is indicated by a rotation arrow on the nameplate Rotation of Moyno 2000 G2 G3 pumps is always clockwise when viewed from the driven end of the pump 1 5 Model Number The pump model number consists of three component parts Frame Designations Type Designa tions and a Trim Code A typical model number for example might be 2G065G2 CDQ AAA as shown on the nameplate in fig...

Страница 5: ...difying pumps to meet specialized pumping conditions If the trim code of your pump is other than AAA contact your nearest Moyno rep resentative for clarification Do not modify your pump with any variation unless you have determined that it is compat ible with your application 2 1 INSTALLATION 2 2 GENERAL Moyno pumps are lubricated and tested at the factory prior to shipment and require minimum pre...

Страница 6: ...uffing box should be throttled slightly to maintain 10 15 PSI higher pressure in the stuffing box than is present in the suction housing See fig 2 2 Flow rate should be approximately 1 2 2 gpm If mechanical seals are to be used on the unit consult the seal manufacturers instructions for seal flush requirements 3 1 OPERATION 3 2 INITIAL CHECK Before putting the pump into operation the following ite...

Страница 7: ...the main elements are very accessible and require few tools to disassemble 4 3 PACKING ADJUSTMENT Pumps Packing gland nuts should be evenly adjusted so they are little more than finger tight See fig 4 1 Over tightening of the packing gland may result in premature packing failure and possible damage to the shaft and gland When packing is new frequent minor adjustments during the first few hours of ...

Страница 8: ...ump preferably with clean water to insure rotor and stator are not dry 2 Shut off pump 3 Close suction and discharge valves 4 Turn off flush water to packing or mechanical seal if used 5 Disconnect power source 6 Drain any fluid in pump 7 Remove inspection plate 17 and gasket 18 Page 5 4 11 Packing Removal 1 Stop pump 2 Complete Section 4 10 steps 2 6 3 Remove gland adjustment nuts E and gland hal...

Страница 9: ...ht on conveyor assembly Remove lock nut 28 from end of conveyor assembly 35 Remove ring gear 27 gear ball 29 secondary thrust plate 30 seal support 31 and gear joint seal 32 Then slide gear joint shell 36 from conveyor assembly Note It is recommended that each time a gear joint is dis assembled the O rings and grease seal should be replaced 4 15 Drive Shaft and Bearings Removal 1 Complete sections...

Страница 10: ...out of stuffing boxes and paddle assemblies 21 4 Pull paddle assemblies 21 toward discharge end of pump to free from drive shafts 17 and 18 4 22 Drive Assembly Shafts Removal 1 Complete Section 4 17 steps 1 3 2 Complete Section 4 18 steps 1 3 3 Complete Section 4 19 4 Complete Section 4 20 5 Remove bearing cover plate 6 6 Loosen set screws on both flange block bearings 10 Page 7 7 Pull both shafts...

Страница 11: ... fig 4 7 The Moyno 2000 pumps are reassembled in the reverse order of dismantling The following suggestions are offered 1 While pump is dismantled check all gaskets seals packing and O rings Replace all worn items It is rec ommended that the gear joint seals 32 gear joint O rings 24 38 and stator O ring 20 be replaced each time either of the gear ioints is disassembled 2 During the assembly proces...

Страница 12: ...ld tightly in place and bearings do not turn freely 3 Remove bearing spacer halves 6 Thoroughly pack lubricant around rollers and on bearing races Install one half of bearing spacer Fill area between bearings half full of lu bricant and install other half of bearing spacer Note An alternate method of lubricating bearings is as fol lows Pack the rollers of the first cone immediately af ter it is pr...

Страница 13: ...with lip on outside diameter of seal fitting the step on back side of thrust plate 7 Apply a film of grease to splines on inside of gear ball 29 Install gear ball on conveyor assembly 35 with counterbored end end without splines first on conveyor assembly Gear ball should slide freely against shoulder on conveyor assembly Place lock nut 28 on conveyor assembly and tighten against gear ball Apply g...

Страница 14: ...n aligned thread hex head screws T and lockwashers thru stator clamp ring 40A stator adapter 21 and into threaded holes in suction hous ing 19 Evenly tighten the screws 8 Slide gear joint retainer 34 into end of gear joint shell 33 being careful that O ring 24 remains in the slot and that gear joint seal 32 is properly seated in position Rotate gear joint retainer 34 until its holes become aligned...

Страница 15: ...n idler shaft 14 thru irregular hole in chain cover 5 and thread into idler arm 7 3 Position key L on shaft 17 and slide torque limiter 3 and sprocket 4 onto shaft 17 4 Place drive sprocket 33 on drive shaft of pump with set screws facing away from bearing housing 5 Align torque limiter sprocket 4 idler sprocket 15 and drive sprocket 33 Install chain 9 ensuring that pad dle assemblies remain 90 de...

Страница 16: ... White Optional packing on all lines D DOUBLE MECHANICAL SEAL Optional on all lines Not offered on 2 L frame F BRAIDED TEFLON FOOD GRADE PACKING White Standard on all Quick Disassembly pumps Optional on all other lines G 100 GRAPHITE PACKING Gray Optional to all lines H FLUSH PACKING GLAND S SINGLE MECHANICAL SEAL Optional on all lines W WATER FLUSH Optional on all lines X Special to application P...

Страница 17: ...Page 14 4 58 STANDARD HARDWARE FOR G2 OPEN THROAT TORQUE GUIDELINES CHART Note Torque values are from the Industrial Fasteners Institute and Craftsman Corp ...

Страница 18: ...ator Select G2 Stator part number by number of stages 2G036G2 CDQ AAA and Model Page 18 2G036G2 CDQ AAA Table 4 5 G2 Discharge Flange Select G2 Discharge Flange by Type Designation 2G036G2 CDQ AAA Page 18 number of stages 2G036G2 CDQ AAA and Model 2G036G2 CDQ AAA Table 4 6 G3 Parts List Select G3 part number by Drive End 2G036G3 CDQ AAA and Type Designation Page 20 where listed 2G036G2 CDQ AAA Tab...

Страница 19: ...Page 16 4 60 PARTS LIST FOR G2 OPEN THROAT Table 4 1 G2 Parts List ...

Страница 20: ...Page 17 FOLD OUT FOR EXPLODED VIEW OF PUMP Notes ...

Страница 21: ...Page 18 ...

Страница 22: ...Page 19 Figure 4 7 G2 open throat pump exploded view ...

Страница 23: ...Page 20 4 61 STANDARD HARDWARE FOR G3 BRIDGE BREAKER 4 62 PARTS LIST FOR G3 BRIDGE BREAKER Table 4 6 G3 Parts List ...

Страница 24: ...Page 21 FOLD OUT FOR EXPLODED VIEW OF PUMP Table 4 7 Shaft Sleeve Arrangement Table 4 8 Shaft Sleeve Conversion Kit Figure 4 8 Stuffing Box Rework Dimensions for Shaft Sleeve Option ...

Страница 25: ... 4 7 be machined flat and that two drilled and tapped holes be added for mounting the bridge breaker bearing support This can be done internally or at a local machine shop fol lowing the dimesional data shown in fig 4 9 Alter nately a G3 bearing housing Ref No 34 Section 4 62 may be ordered Figure 4 9 Bearing housing machining to convert G2 to G3 ...

Страница 26: ...Page 23 Figure 4 10 G3 bridge breaker exploded view ...

Страница 27: ...ft 4 2 Remove two O rings 47 from interior of sleeve 4 66 Assembly Assemble pump to the point where slinger ring 11 is installed on drive shaft 4 then install sleeve kit 46 as follows 1 Lubricate two O rings 47 and insert in grooves in inte rior of sleeve 48 Loosely install four to six set screws 49 in sleeve but be sure they do not protrude into interior of sleeve 2 Install sleeve unit 47 48 49 o...

Страница 28: ...Page 25 ...

Страница 29: ...hnology Corp Hastelloy is a trademark of Cabot Corp Monel is a trademark of INCO Alloy Corp Hypalon and Teflon are trademarks of E I DuPont de Nemours and Company Thiokol is a trademark of Morton Thiokol Inc Printed in U S A Moyno Inc is a Unit of Robbins Myers Inc Your Moyno Authorized Service Distributor is ...