Overview of Installation Procedure
http://www.motorola.com/computer/literature
1-3
1
Overview of Installation Procedure
The following table lists the things you will need to do to use this board
and tells where to find the information you need to perform each step. Be
sure to read this entire chapter, including all Cautions and Warnings,
before you begin.
Table 1-1. Startup Overview
What you need to do...
Refer to...
Unpack the hardware.
.
Reconfigure jumpers or switches on
the MVME167P board as necessary.
.
Reconfigure jumpers or switches on
the MVME712 series transition
module as necessary.
Preparing the Transition Module
Install the board and transition
module in a chassis.
MVME167P and Transition Module Installation
Connect a display terminal.
MVME167P and Transition Module Installation
Connect any other equipment you will
be using.
Chapter 6, Connector Pin Assignments
For more information on optional devices and
equipment, refer to the documentation provided with
the equipment.
Power up the system.
Chapter 2, Startup and Operation
.
.
Note that the firmware initializes and
tests the board.
.
You may also wish to obtain the 167Bug Firmware
User’s Manual, listed in
.
Содержание MVME167P
Страница 1: ...MVME167P Single Board Computer Installation and Use V167PA IH2 December 2001 Edition ...
Страница 12: ......
Страница 14: ......
Страница 20: ......
Страница 36: ......
Страница 50: ......
Страница 84: ......
Страница 90: ......
Страница 94: ......
Страница 100: ......
Страница 106: ......
Страница 116: ......