PREPARING FOR FIELD LEVEL TESTING: Flip Assembly
7-12
68P80400P94-O
7.12.2 Install:
Required Tools:
Black stick.
Preparation:
Check that the Flip is in the open position.
1. Align flip assembly to front housing. Carefully guide the Flex connector through opening in
front housing. (see Figure 7-12.)
2. Slip the left knuckle side of the Flip Assembly into position. (see Figure 7-13.)
3. Insert black stick in cam mechanism side to press on hinge while inserting left knuckle into
position while aligning flip and housing. (see Figure 7-13.)
4. Continue to carefully push the Flip Assembly into position with the front housing.
5. Once set, check the hinge position by opening and closing the flip looking for binding or other
unusual action. Flip should open smoothly and close completely.
Figure 7-12.
Figure 7-13.
Left Knuckle
Hinge/Cam
Содержание i760
Страница 22: ...OVERVIEW SIM Cards 1 8 68P80400P94 O ...
Страница 36: ...This page intentionally left blank ...
Страница 38: ...This page intentionally left blank ...
Страница 52: ...This page intentionally left blank ...
Страница 71: ...PREPARING FOR FIELD LEVEL TESTING Back Housing 68P80400P94 O 7 9 Figure 7 5 Figure 7 6 ...
Страница 76: ...PREPARING FOR FIELD LEVEL TESTING Exploded View and Parts List 7 14 68P80400P94 O 7 15 2 i850 Exploded View ...
Страница 78: ...PREPARING FOR FIELD LEVEL TESTING Exploded View and Parts List 7 16 68P80400P94 O 7 15 4 i760 Exploded View ...
Страница 96: ...FIELD LEVEL TEST MODES AND PROCEDURES MOTOtalk 8 18 68P80400P94 O This page intentionally left blank ...
Страница 99: ... Recommended Equipment 6 3 Audio jack Cover Dog House must be removed If present prior Rework or Baking ...