Using the generator

12/06/03 

 M37GB_1500G_GE

WARNING

!

Access  forbidden  to  area  adjacent  to 

electricity-generating  group  for  all  non-

authorized personnel.

It is absolutely forbidden to connect the unit 

to the public mains and/or another electrical 

power source .

37

REV.3-11/11

The electricity-generating groups are to be considered 

electrical energy producing stations.

The  dangers  of  electrical  energy  must  be  considered 

together with those related to the presence of chemical 

substances (fuels, oils, etc.), rotating parts and waste 

products (fumes, discharge gases, heat, etc.).

GENERATION IN AC (ALTERNATING CURRENT)

Before  each  work  session  check  the  efficiency  of  the 

ground connection for the electricity-generating group if 

the distribution system adopted requires it, such as, for 

example, the TT and TN systems.

Check that the electrical specifications for the units to be 

powered - voltage, power, frequency - are compatible 

with those of the generator. Values that are too high or 

too low for voltage and frequency can damage electrical 

equipment irreparably.

In some cases, for the powering of three-phase loads, 

it is necessary to ensure that the cyclic direction of the 

phases corresponds to the installation’s requirements.

Connect  the  electric  devices  to  be  powered  to  the 

AC sockets, using suitable plugs and cables in prime 

condition.

Before starting up the group, make certain no dangerous 

situations exist on the installation to be powered.

Check that the thermal-magnetic switch (Z2) is in the OFF 

position (input lever in downward position).

Start up the electricity-generating group, positioning the 

thermal-magnetic switch (Z2) and differential switch (D) 

to ON (input lever in upward position). 

Before powering on the utilities, check that the voltmeter 

(N) and frequency meter (E2) indicate nominal values; 

in addition, check on the voltmeter change-over switch 

(H2) (where it is assembled) that the three line voltages 

are the same.

+

 

In the absence of a load, the values for voltage and 

frequency can be greater than their nominal values. See 

sections on VOLTAGE and FREQUENCY.

OPERATING CONDITIONS

POWER

The electrical power expressed in kVA on an electricity-

generating  group  is  the  available  output  power  to  the 

reference environmental conditions and nominal values 

for: voltage, frequency, power factors (cos 

ϕ

).

There  are  various  types  of  power:  PRIME  POWER 

(PRP), STAND-BY POWER established by ISO 8528-1 

and 3046/1 Norms, and their definitions are listed in the 

manual’s TECHNICAL SPECIFICATIONS page.

+

 

During the use of the electricity-generating group 

NE-

VER EXCEED 

the power indications, paying careful at-

tention when several loads are powered simultaneously.

VOLTAGE

GENERATORS WITH COMPOUND SETTING 

(THREEPHASE)

GENERATORS WITH CONDENSER SETTING 

(SINGLEPHASE)

In these types of generators, the no-load voltage is 

generally greater than 3–5% with respect to its nominal 

value; f.e. for nominal voltage, threephase 400Vac 

or singlephase 230Vac, the no-load voltage can be 

comprised between 410-420V (threephase) and 235-

245V (singlephase). The precision of the load voltage 

is maintained within ±5% with balanced loads and 

with a rotation speed variation of 4%. Particularly, with 

resistive loads (cos 

ϕ

 = 1), a voltage over-elevation 

occurs which, with the machine cold and at full load, 

can even 10 %, a value which in any case is 

halved after the first 10-15 minutes of operation.  

The insertion and release of the full load, under constant 

rotation speed, provokes a transitory voltage variation 

that is less than 10%; the voltage returns to its nominal 

value within 0.1 seconds.

GENERATORS WITH ELECTRONIC SETTING (A.V.R.)

In  these  types  of  generators,  the  voltage  precision  is 

maintained within ±1,5%, with speed variations comprised 

from -10% to +30%, and with balanced loads. The voltage 

is the same both with no-load and with load; the insertion 

and release of the full load provokes a transitory voltage 

variation that is less than 15%; the voltage returns to its 

nominal value within 0.2–0.3 seconds.

FREQUENCY  

The frequency is a parameter that is directly dependent 

on the motor’s rotation speed. Depending on the type of 

alternator, 2 or 4 pole, we will have a frequency of 50/60 

Hz  with  a  rotation  speed  of  3000/3600  or  1500/1800 

revolutions per minute.

WARNING

!

For the canopy generator sets provided with doors, 

the following instruction shall be observed. During 

the  normal  operation,  the  doors  of  the  engine 

compartment  and/or  the  electrical  box  shall  be 

kept closed, locked up if possible, as they must be 

considered in all respects as protection barriers. 

The  access  to  the  internal  parts  shall  occur  for 

maintenance purposes only, by qualified personnel 

and, in any case, when the engine is stopped. 

Содержание GE 20 YSX

Страница 1: ...USE AND MAINTENANCE MANUAL MOSA 25 09 12 84920M00 preparato da UPT approvato da DITE GE 20 YSX 849209003 GB 0 3 1 3...

Страница 2: ...des a tank an engine alternator unit fixed on the base by elastic dampers a roll bar with hook for an easy and sure lifting a chest hinged to the roll bar for a quick access to the engine and to the a...

Страница 3: ...continue to satisfy the needs of its clients aswell as to improve the transparency and thecom munications regarding all the company s activesin accordance with the official procedures and inhar mony w...

Страница 4: ...INSTALLATION M 2 7 INSTALLATION AND DIMENSIONS M 3 UNPACKING M 4 2 TRANSPORT AND HANDLING M 6 20 CTL 20 ASSEMBLY M 20 SET UP FOR OPERATION M 21 START AND STOP M 31 CONTROLS M 32 CONTROLS M 39 12 EP6...

Страница 5: ...matter In no case MOSA division of B C S S p A will be held responsible for any damaga direct or indirect in relation with the use of the given information MOSA division of B C S S p A does not take...

Страница 6: ...mpness and heat You must take into account that some figures contained in it want only to identify the described parts and therefore might not correspond to the machine in your possession INFORMATION...

Страница 7: ...elf the list of these directives is part of the declaration of conformity included in any machine standard equipment Here below the adopted symbol CE marking is clearly readable and unerasable and it...

Страница 8: ...mber ______________________________ conforme con quanto previsto dalle Direttive Comunitarie e relative modifiche est en conformit avec ce qui est pr vu par les Directives Communautaires et relatives...

Страница 9: ...wer PRP maximum available power for use at variable loads for a yearly illimited number of hours The average power to be taken during a period of 24 h must not be over 80 of the PRP It s admitted over...

Страница 10: ...persons or things Do not use without protective devices provided Removing or disabling protective devices on the machine is prohibited Do not use the machine if it is not in good technical condition...

Страница 11: ...ersons Use only with safety clothing It is compulsory to use the personal protection means given in equip ment Use only with safety clothing It is compulsory to use the personal protection means given...

Страница 12: ...tely Wipe up spilled fuel before starting engine An electric shock can kill Shut off fuel of tank when moving machine where it is assembled Avoid spilling fuel on hot engine Sparks may cause the explo...

Страница 13: ...s are equipped with a control system that is NOT influenced by standard environmental fac tors and is able to stop the unit in case of anomalous values in the fundamental parameters In order to avoid...

Страница 14: ...nce no specific mea sures are needed in this regard In case of doubts concerning your genset do not hesitate to contact our technical sales office Installation instructions M 2 6 1 REV 0 06 10 ATTENTI...

Страница 15: ...fix the genset to it by using screw anchors or rag bolts Base dimensions should exceed genset dimensions of at least 200 mm on each side Base should weigh three times static genset weight indicated on...

Страница 16: ...duct should be evaluated If the duct is not appropriately insulated room temperature may in crease considerably for this reason it may be necessary to install an electro ventilator for correct air ex...

Страница 17: ...Installazione Installation Installation Luftzirkulation Instalaci n GE 20 YSX M 2 7 REV 0 09 12 27 09 12 84920 I...

Страница 18: ...Dimensioni Dimensions Dimensions Abmessungen Dimensiones GE 20 YSX M 2 7 1 REV 0 09 12 27 09 12 84920 I...

Страница 19: ...rough handling or taking away of parts contained inside the packing or in the set In case you find damages rough handling or absence of parts envelopes manuals etc we advise you to inform immediately...

Страница 20: ...ide the panel and to the instruments on the front To access the hook points on the top of the unit use approved ladders only or support from another opera tor climb the ladder using non skid shoes ATT...

Страница 21: ...nnected to the generating set baseframe it can not be towed on public roads Therefore it can only be used on private roads and no through traffic zones The maximum speed allowed is 40 km h on smooth s...

Страница 22: ...the machine to the ground and place the parking foot definitively regulating at the suitable height ATTENTION Do not substitute the original tires with other types 7 8 9 Nota Lift the machine and asse...

Страница 23: ...he state of the battery from the colour of the warning light which is in the upper part Green colour battery OK Black colour battery to be recharged White colour battery to be replaced DO NOT OPEN THE...

Страница 24: ...t an easy job A lack in tacking these precautions would result in the mix of different additives used in different coolants which would originate gelatinous substances capable of obstructing the cooli...

Страница 25: ...ng and on the display the word fail appears Turning the key on OFF the EP6 is reset and a new starting cycle can be fixed Stop it is COMPULSORY to disconnect the load first then to stop the engine tur...

Страница 26: ...ing light PTO HI B5 Auxiliary current push button C2 Fuel level light C3 E A S PCB C6 Control unit for generating sets QEA D Ground fault interrupter 30 mA D1 Engine control unit and economiser EP1 D2...

Страница 27: ...Comandi Controls Commandes Mandos GE 20 YSX M 31...

Страница 28: ...ol tage operation messages 15 A C socket AUX sockets for load connection I6 Start Local Remote selector Selection of engine control in use Local start control on board EP6 operated Remote start extern...

Страница 29: ...0 In case of an Automatic Periodic Test A P T the display will show the message tESt 2 2 MANUAL operating mode To start the engine follow the instructions A Turn ON the KEY SWITCH the EP6 illuminates...

Страница 30: ...matically anytime the key switch is turned ON The LEDs and DISPLAY light up for about 1 second 6 0 Parameters and settings The unit is programmed by the supplier of the Gen erating Set Contact the Gen...

Страница 31: ...ing for at least 2 seconds the EP6 will energize the over voltage protection Hi U see section 4 0 to stop the engine The inh code inhibits the over voltage P 8 Generator Under Frequency Inh inh 1 to 9...

Страница 32: ...P 24 P 24 Crank OFF Inh Crank Termination setting 100 800 rpm If the speed rises above the setting the EP6 terminates the crank cycle One sec onddelay avoids false termination The code Inh inhibits t...

Страница 33: ...rror accumulation and in case your unit is programmed to allowAutomatic Periodic Test we recommend the following procedures disconnect the power supply of the EP6 consult your genset supplier wait for...

Страница 34: ...ions and nominal values for voltage frequency power factors cos There are various types of power PRIME POWER PRP STAND BY POWER established by ISO 8528 1 and 3046 1 Norms and their definitions are lis...

Страница 35: ...e motor allows it see to a start up with reduced voltage star point triangle start up or with autotransformer or use a soft start system In all cases when the user circuit requires the start up of an...

Страница 36: ...tection forcefully pressed to prevent its intervention ATTENTION USAGE WITH EAS AUTOMATIC START UP PANEL The electricity generating group in combination with the EAS automatic start up panel forms a u...

Страница 37: ...ng NOTE LEGEND A3 1 Adjustment potentiometer insulation resi stance A3 2 Manual reset push button A3 3 Test push button A3 4 Auxiliary fedding presence LED A3 5 TRIP LED A3 2 A3 3 A3 1 A3 5 A3 4 RESET...

Страница 38: ...e front plate X1 and or rear plate with a multiple connector N B The remote control TCM 35 can be used only with machines equipped with control and protection device EP6 U7 For use of TCM 35 see page...

Страница 39: ...ernal tank at the same level of the generator the minimum diameter of the connecting hoses must be 15 mm the maximum length of the connecting hoses must be 5m A pressure sensor on the return pipe of t...

Страница 40: ...s and connections daily Clean periodically using a vacuum cleaner DO NOT USE COMPRESSED AIR DECALS AND LABELS All warning and decals should be checked once a year and replaced if missing or unreadable...

Страница 41: ...year even if the requested number of hours has not been attained EVERY WEEK EVERY MONTH AND OR AFTER INTERVENTION ON LOAD EVERY YEAR 1 TEST orAUTOMATIC TEST cycle to keep the generating set constantl...

Страница 42: ...e Department Black smoke 1 Air filter clogged 2 Overload 3 Injectors defective Injection pump requires calibration 1 Clean or replace 2 Check the load connected and diminish 3 Ask for intervention of...

Страница 43: ...motor running speed 2 Voltage regulating device where it is assembled defective or requires calibration 3 Alternator defective 1 Regulate speed to its nominal no load value 2 Adjust regulator device...

Страница 44: ...he covers and all the other parts of the machine carefully Protect the machine with a plastic hood and store it in o dry place DIESEL ENGINE For short periods of time it is advisable about every 10 da...

Страница 45: ...f the various components of the machine must be made accordingly to rules in force of law a o local rules Particular attention must be paid when getting rid of lubricating oils battery electrolyte and...

Страница 46: ...filter clogging T4 Warning light air filter clogging U4 Polarity inverter remote control V4 Polarity inverter switch Z4 Transformer 230 48V W4 Diode bridge polarity change X4 Base current diode bridge...

Страница 47: ...GE 15 YSX GE 20 YSX M 61 REV 0 09 12 Schema elettrico Electric diagram Schemas electriques Stromlaufplan Esquema el ctrico 27 09 12 84910 I...

Страница 48: ...o di n Pag n 4 Date Appr Approved Project Denomination Machine Modification Date Da Pag Alla Pag To Page From Page Designer of n Desi Dis n Exp Page n Dwg n Disegnatore 5 5 4 3 27 26 3 4 26 27 3 27 4...

Страница 49: ...GE 20 YSX M 61 3 REV 0 09 12 Schema elettrico Electric diagram Schemas electriques I GB F D E NL Stromlaufplan Esquema el ctrico 27 09 12 84920 I...

Страница 50: ......

Отзывы: