25
DK ENG
Mounting
Remove or fix any existing damper in the chimney in the open position.
It is important that there are a few millimetres between the insert box and the surrounding ma-
sonry. Otherwise, the thermal expansion of the insert box may cause cracking of the masonry.
As an initial estimate, the dimensions of the insert opening in the masonry are 870 mm.x545
mm.x510mm. (width x height x depth).
The insert must be levelled with the levelling screws. Note that the insert box must be even (flush)
with the masonry.
The insert is connected to the chimney by a 150 mm in diameter flue pipe that is fastened to the
flue collar.
Seal between the flue pipe and the masonry chimney with refractory mortar. A thermal expansion
of the flue pipe may cause cracking of the refractory mortar. Therefore, it is important to use a
wall bushing and sealing cord.
If there is no cleaning door as shown in the drawings, it may be advantageous to install one. This
will make the installation of the flue pipe easier, and in some cases, the chimney sweep may
require one.
For the Morsø S80-90 stove, you will
need to connect a 45 degree pipe bend
or a flexible pipe to the cast-iron flue
pipe (1). With the pipe bend, you can
achieve both horizontal and vertical
smoke outlet, depending on which way
you turn the pipe bend when you fit it.
Positioning of baffles
The baffles (2) and (3), made from ver-
miculite, have been positioned when
you receive the stove.
However, it is necessary that you
check that they are correctly posi-
tioned before you light your stove for
the first time (please refer to the dia-
gram).
2
3
1
Revisions
Rev.
Sign.:
Title:
Drawing no.:
1:5
Snit til vejledning
S80-90
RSV
22.10.10
A4
Date of print: 22-10-2010
U:\udv\Tegninger\Pladejernsovne 2010\S80_90 - 23.07.2010\115A_0000_001_ASM.sldasm
S80-06 a
Itemno.:
This drawing is Morsø Jernstøberi A/S' property and must not be sold, lended or copied without any written authorization from the company.
Material:
Weight:
Model no.
Drawingtype:
Location of file:
Scale:
Format:
Released:
Construction:
Date:
Содержание S80-90
Страница 19: ...19 DK ...
Страница 20: ...20 NG ...
Страница 27: ...27 DK 600 25 100 Min Date of print 22 10 2010 This draw Material Weight Model n Drawing Location of C C F 5 ...