01
Switch on the machine using the
main switch.
Turn the switch to the position ON.
02
Verify that the pressure in input, dis-
played on the input manometer, is
correct.
MIN 6 BAR
03
Open the valve on the pre-melting
unit:
The valve with the lever in vertical
position indicates that it is open.
04
Verify the preset temperatures.
05
Wait for warm-up phase.
06
At the end of warming up the ma-
chine is running a series of cycles of
opening and closing of the glue
valve.
07
Press the BUTTON
Perform the procedure of glue re-
storing.
08
To produce a milled book, please ad-
just the milling depth.
09
To produce a not milled book, please
use the lever for lowering the milling
unit.