Pre Start Inspection and Operation
3.25
b. Remove the protective covers (Items 3,
Figure 3–33
) from the attachment quick
connectors.
c.
Wipe off the end of each of the connectors (Items 1, 2, 4, 5,
Figure 3–33
) to remove any
dirt or debris.
Figure 3-33 Auxiliary Hydraulic Quick Connects
d. Insert the attachments male coupling (Item 2,
Figure 3–33
) into the female bulkhead
quick connect coupling (Item 1,
Figure 3–33
) on the machine and push until the
connector locks into position.
e. Repeat the above process to connect the attachments’ female quick connect (Item 4,
Figure 3–33
) on the other hose to the male bulkhead connector (Item 5,
Figure 3–33
) on
the machine.
f. Check the security of both connections by gently tugging on the attachment hoses to
make sure that the quick connects are seated properly.
1
2
3
5
4
3
Содержание BOXER 320
Страница 6: ...iv Affix Stamp Here Morbark LLC 8507 S Winn Rd P O Box 1000 Winn MI 48898 ...
Страница 25: ...Operating Controls 2 8 ...
Страница 55: ...Pre Start Inspection and Operation 3 30 ...
Страница 71: ...Routine Service and Maintenance 4 16 Figure 4 15 Battery and Connections 6 2 3 4 5 1 ...