Pre Start Inspection and Operation
3.10
Machine Shut-down
To safely shut the machine down, the operator must:
1. Park the machine on a solid, level area.
2. Lower the loader arm and attachment to the ground.
3. Idle the engine for 5 - 10 minutes to allow the machine to cool down.
4.
Shut off the engine.
5.
Clean off any accumulated mud and/or dirt from the machines operating surfaces, i.e.
operator’s platform, both track assemblies, etc.
Содержание BOXER 320
Страница 6: ...iv Affix Stamp Here Morbark LLC 8507 S Winn Rd P O Box 1000 Winn MI 48898 ...
Страница 25: ...Operating Controls 2 8 ...
Страница 55: ...Pre Start Inspection and Operation 3 30 ...
Страница 71: ...Routine Service and Maintenance 4 16 Figure 4 15 Battery and Connections 6 2 3 4 5 1 ...