Pre Start Inspection and Operation
3.12
Figure 3-11 Travel Chains and Binders
Lifting Procedures
When it becomes necessary to lift the machine
1. Use a lifting device that can safely lift 4,000 lbs (1820 Kg).
2. Use appropriate lifting chains (Item 1,
Figure 3–12
) that can safely lift 4,000 lbs (1820
Kg).
3. Route the chains through the lifting eye (Item 2,
Figure 3–12
) located directly in front of
the operating controls.
•
Lift the machine approximately 12” to make sure that the machine is balanced
before completing the lift.
• If lifting the machine with an attachment installed, the overall machine may not
be balanced from front to back.
CAUTION
3
4
2
1
3
Содержание BOXER 320
Страница 6: ...iv Affix Stamp Here Morbark LLC 8507 S Winn Rd P O Box 1000 Winn MI 48898 ...
Страница 25: ...Operating Controls 2 8 ...
Страница 55: ...Pre Start Inspection and Operation 3 30 ...
Страница 71: ...Routine Service and Maintenance 4 16 Figure 4 15 Battery and Connections 6 2 3 4 5 1 ...