Start Up
15
B : Operator Check list
It is the owner / drill operators’ responsibility to set up the drill for:
1. Sowing depth according to conditions in each soil type and pre worked condition
2. Tramline bout number to suit tramlines
3. Tramline
track
width
4. Number of rows shut off whilst tram lining
5. Marker width setting to allow matching of bouts
6. Operation of half width shut off
It is also the owner / operator’s responsibility to check the operation of the various
functions of the machine between each hopper fill, or at least once every hour to check the
machine is operating correctly.
Содержание 240G
Страница 9: ...Safety Instruction Decals Safety Stickers 9 ...
Страница 10: ...Safety Instruction Decals 10 ...
Страница 11: ...Safety Instruction Decals 11 25 ...
Страница 12: ......
Страница 22: ...Settings A Distribution Settings Size metres 2 40 3 00 Turns 62 5 50 22 ...
Страница 37: ...Flow Rate Tables Calibration Procedure 37 ...
Страница 38: ...Flow Rate Tables Calibration Procedure 38 ...
Страница 39: ...Flow Rate Tables Calibration Procedure 39 ...
Страница 40: ...Flow Rate Tables Calibration Procedure 40 ...
Страница 43: ...Grassland Parts booklet 2007 grassland seeding line ...
Страница 45: ...Grassland Main Chassis ...