Montigo L42DF series Скачать руководство пользователя страница 13

Page 13

L42DF* Indoor Gas Fireplace

XG0181 - 

150204

Installation

1

12”

2”

12”

12”

Section 3-3:

 

 Installing a Wall Mounted Direct Vent Termination 

This section applies to installations where the direct vent termination 

will be wall mounted.

Installation of Termination with built in frame

A Termination with a Built-In Frame is installed during framing of a structure.

1.  Frame the termination opening to 11" x 11".

2.  Install exterior sheathing to the structure framing.

3.   Fasten the termination to the sheathing using a minimum of 4 screws.

MSR Frame

PTO-4 (5"/8")

Termination

PTO-4F (5"/8")

Termination

Figure 12.

  

Installing a PTO-F termination.

Figure 12a.

  

Installing a PTO termination with the MSR frame.

Figure 12d.

  

Installing the VSS Vinyl Shield.

Installation of a termination shield for Vinyl Siding

The VSS Termination shield is installed when the exterior of a structure 

is clad with Vinyl siding. It is placed directly above, and on-centre with 

the termination. 

Installation of termination frame at time of framing

Terminations with a MSR frame allow the installation of the frame prior 

to installation of the termination.

1.  Frame the termination opening to 12" x 12".

2.  Secure the MSR Frame to the exterior sheathing of the structure.

3.   Fasten the termination to the MSR Frame using a minimum of 4 screws.

Figure 12b.

  

Installing a PTO termination with the BSR frame.

Installation of termination frame at time of framing in Masonry

Terminations with a BSR frame allow the installation of the frame in 

masonry prior to the installation of the termination

1.  Frame the BSR opening to 12" x 12".

2.  Secure the BSR Frame to the exterior sheathing of the structure.

3.   Fasten the termination to the BSR Frame using a minimum of 4 screws.

1.  Frame the MOSR opening to 12" x 12".

2.  Fasten the MOSR frame to the interior side of the studs, concrete, 

or finished wall construction using a minimum of 4 screws.

3.  Insert the termination into the MOSR frame as shown here, (

from 

the inside

) and attach to the MOSR by installing a min. quantity of 

4 bolts into the threaded 

nuts on the MOSR Frame.

Installation of termination from inside structure

A Termination with a MOSR Frame is installed from the inside of the 

structure. These are commonly used in high-rise construction.

MOSR Frame

PTO-4 (5"/8")

Termination

Figure 12c.

  

Installing a PTO termination with  MOSR frame.

BSR Frame

MTKOG 

(5"/8")

Installing Heat Guards over Terminations 

is recommended in 

installations where the termination is

  located within 7' feet above 

grade, 

or 

above a pedestrian walkway, 

and

 may be Required by code 

in Public areas.

1.  Ensure that the two 

long

 

mounting brackets are facing the bottom 

of the termination. (See inset). This will provide more heat protection 

at the top of the termination, where temperatures are highest.

2.  Attach to the faceplate of the termination using four sheet metal 

screws.

Figure 13.

  

Installing a PTO termination heat guard.

11”

11”

Framing

Exterior 

Sheathing

Fastening Hardware, 

minimum 4-screws

Framing

Exterior 

Sheathing

Fastening Hardware, 

minimum 4-screws

PTO-4 (5"/8")

Termination

Framing

Exterior 

Sheathing

Fastening Hardware, 

minimum 4-screws

12”

12”

Fastening Hardware, 

minimum 4-screws

Framing, 

concrete or 

other 

materials

Exterior 

Sheathing, 

concrete or 

other materials

Exterior Vinyl 

siding

PTO-4 (5"/8")

Termination

VSS Vinyl shield

Содержание L42DF series

Страница 1: ...e Toxic Flammable materials Corrosive Fork lift trucks Danger overhead crane Explosion risk Oxidising Danger of death Biohazard Laser Radiation Danger of entrapment Hot surface General Warning Blank G...

Страница 2: ...t Vent Termination PVTK 1 11 Section 3 2 1 Venting Layout 11 Section 3 3 1 Venting Layout Wall mounted termination 14 Section 3 3 2 Venting Components 18 Section 3 3 3 Heat Shields 19 Section 4 Wiring...

Страница 3: ...being installed This installation operation and maintenance manual is applicable to the modelsdescribedinthetable Refertoyourratingplatetoverifyincluded options Throughout this instruction guide inst...

Страница 4: ...must conform to the local codes or in the absence of local codes to the current version of National Fuel Gas Code ANSI Z223 1 NFPA 54 Electrical Installations must conform to the local codes or in th...

Страница 5: ...llation Rating Plate Sample Figure A Rating Plate for IPI eletronic ignition LB1223 V5 1 SIT IPI with screen DEC06 2014 Teklynx LabelView Demo Figure B Rating Plate for standing pilot SIT LBL1205 V6 1...

Страница 6: ...replace may be installed in any location that maintains properclearancestoairconditioningducts electricalwiringandplumbing Safety as well as efficiency of operation should be considered when selecting...

Страница 7: ...Framing for Rear Vent with shelf above the fireplace Note Straight through the wall rear vent available for Natural Gas only Figure4 CombustibleFramingforRearVent withshelfabovefireplace 2 Min 12 Max...

Страница 8: ...s ie cement board or equivalent This is recommended in applications where the facing materials will not adhere to the metal nailing flange 6 NOTE Clearance from top of fireplace to a ceiling within th...

Страница 9: ...arefastenedinplaceasshown TheseareinstalledwiththeWideflanges facing the center of the fireplace opening and the shallow flange toward inside of room These are also fastened with nails or screws flush...

Страница 10: ...go supplies a variety of direct venting and termination options The direct vent termination location MUST be selected such that it is the highest point in the venting assembly It should also be select...

Страница 11: ...mterminationpointis32 abovethefireplace NOTE if the maximum termination height is used the flame pattern may be affected TheVerticalterminationmustbeaminimum2 higherthanwhere the termination exits the...

Страница 12: ...Figure 11c Rear vent Roof mounted venting 1 90 bend Support ring Support plate 32 max MEXT Sections Termination 12 Max PVTK1 Note Imagesareshownwithoutscreensforclaritypurposes However your fireplace...

Страница 13: ...he BSR opening to 12 x 12 2 Secure the BSR Frame to the exterior sheathing of the structure 3 Fasten the termination to the BSR Frame using a minimum of 4 screws 1 Frame the MOSR opening to 12 x 12 2...

Страница 14: ...n with one 90 bend The vent run must comply with Venting Graph forTop vent wall mounted terminations Figure 14 Figure 14b Top Vented wall mounted Multi elbow installation See Venting Graph for Top ven...

Страница 15: ...ted wallmountedRetractedMulti elbowinstallation See Venting Graph for Top vent wall mounted terminations Figure 14 Heat Shield 96 Min 120 Max Note Imagesareshownwithoutscreensforclaritypurposes Howeve...

Страница 16: ...and attach to the termination 45 or less Corner Installation Use an PTO 4 termination and an PFL 1 or PFL 2 PFL 2 12 or 24 compressed length and a frame if appropriate Flex may be turned to obtain de...

Страница 17: ...area the installation is acceptable Example A Acceptable Installation If the vertical dimension from the hearth is 120 and the horizontal run to the wall flange of the vent termination is 138 this wo...

Страница 18: ...ng Envelope Engineer or Waterproofing Consultant for further recommendations Section 3 3 2 Venting Components The following components and associated Montigo part numbers for installation of a roof or...

Страница 19: ...ield MUST be used where the RHS8 Termination Figure 17 and 17a CANNOT be used Use the RHS101 where any of the dimensions are within the parameters shown figure 17a To install the RHS101 Slide the Inne...

Страница 20: ...djustment Screw Inlet Pressure Hi Lo Adjustment Knob Gas Control Knob Shown in Pilot position Figure 20 Wiring Diagram for SIT Nova 820 gas and pilot 1 5V AA type 1 5V AA type 1 5V AA type 1 5V AA typ...

Страница 21: ...r Vent Fireplaces Installing the remote On Off Wall Switch The L42DF gas valve may be connected to a wall switch Do NOT connect any external power to the remote switch The valve will generate its own...

Страница 22: ...valves approved for use by the state province or other governing body in which the fireplace is being installed Section 5 3 GAS CONNECTION See Figure 23 for location of gas line access Flexible gas co...

Страница 23: ...aces which are hot fuel and energy efficient Please be aware temperatures over the mantel will rise above normal room temperature and walls above fireplace may be hot to touch Side wall clearances are...

Страница 24: ...e Screens Grasp each top outer corner of the screen with your thumb and fingerandpulltowardsyourself WhentheupperScreenStudsare free liftthescreenatananglefromthelowerslotsfromwhichthe Screen Bottom T...

Страница 25: ...atch Hook Door Latch Slot Hand hold Locate Door Buckle Tool Figure 26b Door buckle Tool Step 4 Firmly grasp hand hold end of Door buckle tool and place the machined end in the slot under door frame as...

Страница 26: ...pleted firestone installation Second Gen burner shown Note DO NOT place ANY firestones on top of the burners or pilot Figure 27a Operating gas fireplace with firestones surrounding burner tray Second...

Страница 27: ...b cannot be turned from PILOT to OFF unless knob is pushed in slightly Do not force Standing Continuous Pilot Ignition SIT NOVA 820 with American Flame Electronic Ignition For Your Safety READ BEFORE...

Страница 28: ...to the next step 6 Turn fireplace ON using wall switch or remote control 7 If the Fireplace does not light the System will cycle through two trials one minute audible clicking thirty seconds of silen...

Страница 29: ...eglass cleaners One of the most effective products is Kel Kem Silicone seals on inner door during initial firing will off gas leaving a visual deposit of a white substance on combustion chamber walls...

Страница 30: ...nd turn ON 2 Ensure main power is ON or new batteries are installed in the remote control and backup battery pack if available 3 Check the 3 15A fuse in the control box and replace if necessary Pilot...

Страница 31: ...1 Piezo Ignitor PIEZO Pilot Tubing RPTA03 Door RDTL42 Replacement Screen RSCP42 SIT IPI Proflame 2 Replacement Parts List L42DF NG Gas Valve Hi Low RGC3044 LP Gas Valve Hi Low RGC3045 NG Gas Valve wit...

Страница 32: ...ance 100 000 BTU H 30 KW 12 inches 12 inches M clearance to forced air supply inlet 6 feet 3 feet above air inlet N clearance above paved sidewalk or paved driveway located on public property 7 feet 7...

Страница 33: ...anies 2 The Montigo Gas Appliance must be subjected to normal use The Gas Appliances are designed to burn gas only Burning conventional fireplace fuels such as wood coal or any other solid fuel will c...

Страница 34: ...of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one ha...

Страница 35: ...Page 35 L42DF Indoor Gas Fireplace XG0181 150204 Notes Notes...

Страница 36: ...XG0181 150204 L42DF Residential Gas Fireplace...

Отзывы: