• Drill 1/8" Pilot Holes For Mounting Brackets.
Centerline
8" Min. Above
Top Mounting
Bracket Holes
6-1/4"
Centerline To Wall
FOR WALL VENT DUCT
FOR CEILING
VENT DUCTING
Align edge 25-1/2" above Cooking Surface.
17-1/2"
2-5/32"
CL
5-7/8"
8-1/2" Dia. Hole
• Drill 1/8" Pilot Holes For Mounting Brackets.
Align edge 25-1/2" above Cooking Surface.
13-9/16"
2-5/32
"
CL
CL
CL
5-7/8"
Installation Preparation
8
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
• Locate the template packed with the literature.
– Measure 36" from the floor to the top of the cooking
surface. Add 25-1/2" (or other recommended space)
from the cooking surface to the bottom of the hood.
Mark that location.
– Use a level to draw a straight pencil line on the wall.
CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with the hood
and check contents.
2 Large
Flat Washers
2 Phillips Head
Decorative Screws
3 Stainless Steel Grease Filters
10 Wood
Screws
Wall Mount Template
2 Mounting Brackets with 4
Hex Head Leveling Screws
Duct Cover Bracket
6 Wall
Fasteners
2-piece
Decorative Duct Cover
(dimension shown
for reference only)
– Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
• Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
• Measure 6-1/4" from the back wall to the centerline of
a 8-1/2" hole on the ceiling.
Note:
If drywall is not present, add drywall thickness
to the 6-1/4" dimension.
Wall Ducting:
If ductwork will vent to the rear:
• Use the level to draw a line straight up from the
centerline on the template.
• Measure at least 8" above the top mounting bracket
holes shown on the template to the centerline of an
8-1/2" dia. duct hole. (Hole may be elongated for duct
elbow.)
HOUSE WIRING LOCATION:
• The junction box is located on the top of the hood, at
the back right side.
• Route house wiring as close to the ceiling location as
possible, through the ceiling, soffit or back wall. Wiring
should enter at least 4" above the bracket on the right
side (no less than 18" above the planned lower edge of
hood and ideally, 4" to the right of planned ductwork.)
16"
23"
11"
24"