Pre-Tap
Side
Screw
Pre-Tap
Side
Screw
Bracket Tabs
Screws
“B”
Screws
“A”
Installation Instructions
10
4 INSTALL THE HOOD
Place the hood on the brackets and slide left or right to
center.
1. Adjust the installation levelness by tightening or
loosening the screws “A” at the bottom of the brackets.
2. Mark the 2 lower mounting holes.
3. Remove the hood from the wall.
4. Drill a pilot hole in each lower mounting hole location.
The two lower holes can be enlarged to 3/8" if they did
enter studs. Tap anchors for wall fasteners into the bot-
tom holes. Screws should be inserted by hand into the
fasteners to allow anchors to expand against the wall
material. Remove the screws for final installation.
5. Replace the hood on the mounting brackets.
6. Using two large flat washers (supplied), install wood
screws or wall fastener screws.
7. Tighten screws “B” located at the top of the mounting
bracket against the hood to clamp the position. Do not
overtighten screws.
3 INSTALL DUCT BRACKET
The duct bracket must be installed against the ceiling. This
bracket will hold the decorative duct cover in place at the
top.
• Install the 2 small screws into the sides of the duct
bracket. Remove the screws. Pre-tapping the holes will
insure ease of final installation.
Secure the bracket to the ceiling and wall:
• Mark the 4 screw hole locations.
• Drill 1/8" pilot holes in marked bracket location.
• If pilot holes do not enter studs, enlarge the holes to 3/8"
and install wall fastener anchors.
• Drive screws, by hand, into the fasteners to allow
anchors to expand. Remove the screws.
• Secure the bracket to the ceiling and wall with wood
screws and/or fasteners.
Lower Mounting Holes