background image

 

 
Project name / Order N

SC 

Halifax House, High Wycombe, Buckinghamshire, HP12 3SE 

      

W: www.monodraught.com E: [email protected] T: 01494897700 

7.4.

 

Monodraught COOL-PHASE Service Points:  

 

Run test program and review all functions. 

 

The elliptical fan will be checked for correct operation. 

 

Thermal Battery performance verification. 

 

Firmware updated to latest revision. 

 

Check all sensors operating within parameters, and re-calibrate if necessary. 

 

COOL-PHASE System, Thermal Batteries and ductwork checked for cleanliness. 

 

Filter change. 

 

Data logs downloaded for optional performance case study. 

 

Correct operation of actuators within the recirculation module. 

 

Correct operation of Rotational Air Drum. 

The COOL-PHASE system is considered a fixed piece of equipment and is therefore not subject to 
PAT testing. 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание Cool-phase Nova

Страница 1: ...Typical Operating Maintenance Manual Project Name Cool phase Nova Ceiling Mounted Low Energy Cooling Ventilation System ...

Страница 2: ...l info monodraught com Website www monodraught com 2 Equipment Installed 1N COOL PHASE Nova Low Energy Ventilation Cooling and Heat Harvesting System Serving 3 Warranty of period The warranty shall apply for 5 years for natural cooling products The solar driven mechanical and electrical components of such Goods shall have a warranty period of 1 year For full details of our warranty please see our ...

Страница 3: ...sumption by up to 90 compared to a conventional Air Conditioning system The reduction in energy usage combined with low servicing and maintenance costs and a long life result in a strong financial case over traditional cooling approaches Since no compressors or hazardous coolants are used the system also has a number of environmental benefits while the lack of external units means the COOL PHASE s...

Страница 4: ...ed ventilation Ductwork Fascias Wall Controller Pre insulated acoustic ductwork is provided to connect the COOL PHASE system to outside air with a window wall or roof louvre and exhaust grille if supplied by Monodraught Fascias and air diffusers are provided when the COOL PHASE system is suspended below the ceiling For installation above a false ceiling plenum chambers ceiling tiles and diffusers ...

Страница 5: ...Project name Order No SC Halifax House High Wycombe Buckinghamshire HP12 3SE 5 W www monodraught com E info monodraught com T 01494897700 6 Operating Instructions ...

Страница 6: ...Project name Order No SC Halifax House High Wycombe Buckinghamshire HP12 3SE 6 W www monodraught com E info monodraught com T 01494897700 Touchscreen LCD Wall Controller ...

Страница 7: ...Project name Order No SC Halifax House High Wycombe Buckinghamshire HP12 3SE 7 W www monodraught com E info monodraught com T 01494897700 Wiring Diagram ...

Страница 8: ...arrangements Monodraught will make contact to arrange suitable time to access the system 7 2 Recirculation Air Intake Filter The Recirculation filter will be located within the Recirculation module at the point where the air enters the building before being ducted to the COOL PHASE unit see project layout drawings for individual locations The filter is required to ensure both the quality of the ve...

Страница 9: ...ry performance verification Firmware updated to latest revision Check all sensors operating within parameters and re calibrate if necessary COOL PHASE System Thermal Batteries and ductwork checked for cleanliness Filter change Data logs downloaded for optional performance case study Correct operation of actuators within the recirculation module Correct operation of Rotational Air Drum The COOL PHA...

Страница 10: ...ame Order No SC Halifax House High Wycombe Buckinghamshire HP12 3SE 10 W www monodraught com E info monodraught com T 01494897700 8 Wiring Requirements 8 1 Wiring Diagram A Wiring Details for 1N COOL PHASE Unit ...

Страница 11: ...roject name Order No SC Halifax House High Wycombe Buckinghamshire HP12 3SE 11 W www monodraught com E info monodraught com T 01494897700 8 2 Wiring Diagram B Wiring Details for 1N COOL PHASE SLAVE Unit ...

Страница 12: ...rder No SC Halifax House High Wycombe Buckinghamshire HP12 3SE 12 W www monodraught com E info monodraught com T 01494897700 8 3 Wiring Diagram C Wiring Details for 1N COOL PHASE Nova system inter AHU configurations ...

Страница 13: ...puts This allows multiple COOL PHASE units to operate in a single room or zone of a building 9 2 Inputs The system uses the following inputs Details of user controls are contained in Section 4 9 2 1 Fire Alarm Input Optional When the fire alarm is activated the COOL PHASE system will automatically close down until the fire alarm is deactivated the COOL PHASE system will then return to automatic mo...

Страница 14: ... temperatures to ensure they remain above the heating set point See system config setting 8 2 5 Input Priority 9 3 Control Inlet Dampers There are three positions for the inlet volume control dampers 1 External Air Air is brought in from outside the building only No recirculation occurs Name Priority 1 Fire Alarm Input Highest Lowest 2 User Override 4 CO2 Sensor 5 Temperature Sensor ...

Страница 15: ...aught com E info monodraught com T 01494897700 2 Recirculation Air is re circulated within the room or space only No air is brought in from outside 3 Mixed Air Re circulated air is mixed with outside air The volume controller dampers control the proportion of re circulated air to external air ...

Страница 16: ...1494897700 9 4 Outlet Air Paths There are two positions for the outlet control dampers 1 Direct Ventilation Air is passed directly into the room No air is passed through the PCM heat exchanger 2 PCM Heat Exchanger Air is passed over the PCM Heat Exchanger to charge or discharge the thermal energy store before entering the space ...

Страница 17: ...he CO2 levels within the space rise above the seasonal pre set level then the system will provide ventilation proportionally to meet the requirements of the space by opening the external air damper and varying the fan speed until the desired CO2 levels are reached If cooling is required then the system will provide the required ventilation whilst maximising the cooling effect If it is cooler insid...

Страница 18: ...YY directive can be sent back to Monodraught for disposal and recycling Season Spring Summer Autumn Winter Start Date 01 March 1 June 1 Sept 01 Dec Finish Date 31 May 30 August 30 Nov Last day of Feb Occupied hours Day time Cooling provided when room temperature reaches 23 Ventilation provided when internal CO2 levels reaches 900 ppm Cooling provided when room temperature reaches 22 Ventilation pr...

Страница 19: ...rom each end of the COOL PHASE system The internal compound can be removed and disposed of please see COSHH Sheets The aluminium outer shell can be recycled Records of Commissioning Monodraught s commissioning report will be forwarded upon completion of the project Monodraught Working Drawings Please find attached copies of Monodraught drawing N s Manual compiled by Date Compiled 13 09 2017 Signed...

Страница 20: ...Project name Order No SC Halifax House High Wycombe Buckinghamshire HP12 3SE 20 W www monodraught com E info monodraught com T 01494897700 ...

Отзывы: