Installation Conditions Effective June 2018

The Monarch Scaleout is fully covered by a retrospective 3 year parts and 12 months labour 
guarantee for installation within the hard water regions of mainland England as detailed 
on Monarchs National Service Coverage Area, from date of original purchase. Installations 
outside this area are automatically covered by a 3 year parts only ‘exchange’ warranty.
Definition and example of ‘Retrospective: If the resin fails at 30 months, then new resin will 
be replaced under the 3 year guarantee but charged at 30/36ths of the replacement resin 
cost, plus delivery, plus VAT.

PLEASE NOTE 

This guarantee has the following conditions, and is not covered by the following.

1.  Damage caused by high water pressure, we strongly recommend  a 5 bar water pressure  

limiting valve on the inlet to your water supply, where daytime water pressure exceeds a  
static pressure of 3.5 bar (50psi).

2.  This Scaleout is suitable for a mains water supply only.
3.  Damage caused by a dirty mains water supply. The installation of a Monarch Debris 

Filter - cost £99.60 inc VAT & postage - on the supply to your unit cancels this clause. 
The majority of debris in water is caused by local authority work on the water main.  
If notified in advance, by your local water authority, please put your unit onto ‘bypass’,  
see Fig 5. 

For Bypass

: Close both Inlet & Outlet valves, and open Bypass valve. 

For Normal Service: 

Open both Inlet & Outlet valves, and close the Bypass valve.

4.  Call outs due to incorrect installation. If you have any queries when  

installing your Scaleout, please call us on 01986 784759.

5.  The use of any other hoses than those provided. Under no circumstances use washing  

machine hoses.

6.  The effect of aggressive water, the degradation and/or blinding of resin and/or chlorine  

attack on resin.

7.  Under no circumstances plumb in the unit in solid copper.
8.  The installation kit is only covered by the OEM twelve-month parts ‘exchange’  

warranty only.

9.  Compensation as a result of cancelled appointments, damage caused by, or incorrect  

installation of the unit. In the unlikely event of a fault, put the unit onto Bypass, see 3  
above ref ‘For Bypass’ until an engineer calls.

THE ABOVE DOES NOT AFFECT YOUR STATUTORY RIGHTS

Min – Max Operating pressure

1.5 – 5 bar

Temperature

3 – 35ºC

pH

6.5 – 8.5

Max Iron content

0.3 mg/l

Max Manganese content

0/05 mg/l

Max Copper content

0.3 mg/l

Oil & Phosphates 

Free

H2S

Free

Incoming Water Conditions

IMPORTANT

The XP unit must not be installed 
where ambient temperature can 
exceed 35ºC or where there is a 
possibility of HOT WATER transfer 
back through the system into the 
unit. CAUTION should be exercised 
where there is a possibility of 
secondary water expansion from 
the heating boiler back through 
the system into the unit. In such 
circumstances, you are advised to 
fit a single check valve between the 
unit and the boiler.

Содержание Scaleout XP

Страница 1: ...Installer User Guide Effective June 2018 Suppliers to H M the Queen s Estate at Sandringham Monarch Water Ltd T 01986 784759 F 01986 784769 info monarchwater co uk www monarchwater co uk Model No For Monarch Scaleout ...

Страница 2: ...or some time whilst the system is de scaling This is particularly noticeable in your bath and shower 5 Dishwashers On most installations the dishwasher is to be connected to the Scaleout water We recommend that you continue to add a small amount of salt to the appliance as before as this helps the salt holder in the appliance stay clean We do not however recommend that crystal glass solid silver o...

Страница 3: ...n a small tray that allows the water to evaporate Unit must be kept upright B SITING THE SCALEOUT Where possible this should be close to the rising main T off for an untreated mains supply for the outside tap Ensure that the unit is not subject to below 4 or above 50ºC If siting the unit within a kitchen cupboard loft etc Ensure that the base floor is adequately supported If the unit is being inst...

Страница 4: ...ytime pressure can reach nearly 100psi at night Minimum dynamic pressure must exceed 1 5 bar If in any doubt please call us on 01986 784 759 4 H INLET OUTLET CONNECTIONS See Fig 1 Under no circumstances use washing machine hoses or plumb the unit in solid copper pipe Ensure nipples when used have been tightened to seal G INSTALL BYPASS VALVES CHECK VALVE Form an installation as per Fig 1 Below Che...

Страница 5: ...the unit then close tap Allow unit to rest for 15 minutes before future use Check for leaks FIG 2 Connect the inlet hose from the INLET valve male iron adapter on the pipe work to the INLET of the Scaleout see directional arrow on top of unit Connect the outlet hose from the OUTLET valve male iron adaptor on the pipe work to the OUTLET of the Post Filter GOING ON HOLIDAY Fig 2 shows the valves in ...

Страница 6: ...ypass Close both Inlet Outlet valves and open Bypass valve For Normal Service Open both Inlet Outlet valves and close the Bypass valve 4 Call outs due to incorrect installation If you have any queries when installing your Scaleout please call us on 01986 784759 5 The use of any other hoses than those provided Under no circumstances use washing machine hoses 6 The effect of aggressive water the deg...

Страница 7: ... are to be covered strictly by a parts only exchange guarantee as determined by the model range of softeners i e Plumbsoft with 7 years parts All parts sent back to Monarch are at the expense of the sending parties All repaired or replaced items will be returned to the sender on a no charge basis whilst covered by the parts exchange guarantee Once the parts exchange guarantee has expired Monarch r...

Страница 8: ..._____ ______ 20____ 4th Cartridge Change Date ______ ______ 20____ 5th Cartridge Change Date ______ ______ 20____ 6th Cartridge Change Date ______ ______ 20____ 7th Cartridge Change Date ______ ______ 20____ 8th Cartridge Change Date ______ ______ 20____ 9th Cartridge Change Date ______ ______ 20____ 10th Cartridge Change Date ______ ______ 20____ 11th Cartridge Change Date ______ ______ 20____ 12...

Отзывы: