WATER SYSTEMS - 6
CAYMAN 2007
127
De-Winterization
To de-winterize: drain and fi ll the fresh tank
with water. Connect the power supply line
for the water pump. Switch the winterizing
valves back to normal fl ow position. Operate
all faucets, one at a time, until clear water is
present. Install new water fi lters if so equipped.
NOTE:
The first two trays of ice from the
icemaker may contain contaminants.
Discard and replenish the icemaker as
necessary.
SERVICE CENTER
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
13
1. Gravity fi ll.
2. Holding tank monitor.
3. Exterior shower.
4. Sanicon power switch (optional).
5. Storage light/water pump power
switch.
6. Fresh water faucet.
7. Black tank fl ush connection.
8. Tank Fill/City Water valve.
9. City water connection.
10. Grey tank drain valve.
11. Black tank drain valve.
12. Holding tank drain.
13. Fresh water tank drain.
14. Low point drains.
15. Water pump.
16. Soap dispenser.
NOTE:
Layout of Service Center and location of components may vary with floor plans.
Содержание CAYMAN 2007
Страница 12: ...GENERAL INFORMATION 1 CAYMAN 2007 8 NOTES...
Страница 14: ......
Страница 16: ......
Страница 52: ...DRIVING SAFETY 2 CAYMAN 2007 48 NOTES...
Страница 80: ...EXTERIOR INTERIOR CARE 3 CAYMAN 2007 76 NOTES...
Страница 100: ...APPLIANCES 4 CAYMAN 2007 96 NOTES...
Страница 132: ...WATER SYSTEMS 6 CAYMAN 2007 128 NOTES...
Страница 160: ...ELECTRICAL SYSTEMS HOUSE 8 156 CAYMAN 2007 NOTES...
Страница 226: ...INDEX 222 CAYMAN 2007 NOTES...