![Molnar MF1705-93-OH-3T Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/molnar/mf1705-93-oh-3t/mf1705-93-oh-3t_maintenance-manual_1824299018.webp)
Molnar Hoists
All Rounder
Servicing
18
Unpack and place new Wire Ropes
on clean surface to protect integrity
W
hen reinserting new twin Wire Ropes, clearly mark
which Wire Rope is LEFT and which is RIGHT with a
texta, to ensure Wire Ropes are not twisted when fed
behind the hydraulics.
1
Insert the LEFT Wire Rope into the LEFT hole (in the cable
retaining plate, inside the control-post)
Push the Wire Rope up the post.
Keep a slight twist to the left-hand side (to ensure it
remains to the left-hand-side of the post).
2
Pull the Wire Rope completely through the opening in
the control-post and hang to left-hand-side of the control
post.
L
Wire Rope & Pulley Re-Insertion
Wire Rope & Pulley Re-Insertion
3
Repeat the process for
the right-hand Wire Rope
(twisting Wire Rope to the
right to avoid twists).
4
Check Wire Ropes have not
crossed over.
5
Ensure both Wire Ropes
are positioned between
cable retaining bracket
lugs.
Secure Wire Ropes with
cable retaining bracket:
finger tighten screw one
side (with M6 screw),
swing into place and
finger tighten screw on
the other side.
Ensure the bottom Wire
Rope-ends are seated
“hard up” in the cable
retaining plate (inside the
bottom of the post) before
tightening cable retaining
bracket.
6
Insert the long Wire Rope;
feed the non-threaded end of
the long Wire Rope into the top of the control-post, down
the inside of the post.
Feed the other
end of the Wire
Rope over the top
of the hoist and
down the outside
of the non-control-
post. Ensure the
Wire Rope passes
through the post
cover mounting
bracket.
L
R
cable
retaining
bracket lugs
hard up
in cable
retaining
plate