27
Adjustment blocks are used for height adjustment and levelling. They are appropriate
for interior or exterior installation depending on their version. A traverse is required
additionally in case of installation with interior adjustment blocks (JBI). The scope of
delivery includes a total of six exterior adjustment blocks (JBA) per WLK/WLKP, or two
traverses with four interior adjustment blocks:
Installation preparation
¾
Remove the packaging of the system convector without damaging the device.
¾
Remove the installation cover from the convector trough.
¾
You will find the supplied accessories (according to the scope of delivery) in the
connection compartment below the installation cover.
¾
The installation cover may only be removed permanently after the end of all con-
struction work.
Height adjustment
Step-on ability
The adjustment blocks included in the scope of supply are only intended for level-
ling purposes. The following applies in order to achieve step-on ability without ad-
ditional support over the entire surface:
9
with JBA: step-on ability given up to 130 kg/m if distance A is max. 500 mm.
9
with JBA: step-on ability given up to 180 kg/m if distance A is max. 400 mm.
9
with JBI: step-on ability given up to 205 kg/m if distance A is max. 1180 mm.
• Exterior with
foot JBA 8.80
• Interior with
foot JBA 8.80
• Exterior with
fixing JBA 8.80-02
• Traverse
Caution
Permanent damage to the device!
The amount of adjustment blocks included in the scope of delivery is only
intended for levelling purposes! In order to achieve full step-on ability, sup-
port the entire surface of the system convector with a pressure-proof filling
substance, or with a heat and step-on acoustic insulation, or increase the
amount of adjustment blocks (see “step-on ability”)!
Max. load 130 kg/m:
Max. load 180 kg/m:
Length
Convector
Units
Length
Convector
Units
Length
Convector
Units
Length
Convector
Units
1000 mm
6
3250 mm
16
1000 mm
8
3250 mm
20
1250 mm
8
3500 mm
16
1250 mm
10
3500 mm
20
1500 mm
8
3750 mm
18
1500 mm
10
3750 mm
22
1750 mm
10
4000 mm
18
1750 mm
12
4000 mm
22
2000 mm
10
4250 mm
20
2000 mm
12
4250 mm
24
2250 mm
12
4500 mm
20
2250 mm
16
4500 mm
26
2500 mm
12
4750 mm
22
2500 mm
16
4750 mm
26
2750 mm
14
5000 mm
22
2750 mm
16
5000 mm
28
3000 mm
14
3000 mm
18
A
kg
130
JBA:
A = 500 mm
kg
180
JBA:
A = 400 mm
Top view
Convector
length
Units
Length
Convector
Units
Length
Convector
Units
Length
Convector
Units
1000 mm
2
2250 mm
3
3500 mm
4
4750 mm
5
1250 mm
2
2500 mm
4
3750 mm
5
5000 mm
6
1500 mm
3
2750 mm
4
4000 mm
5
1750 mm
3
3000 mm
4
4250 mm
5
2000 mm
3
3250 mm
4
4500 mm
5
The number of necessary traverses and interior adjustment blocks for the respective
convector length can be taken from the following table.
The number of necessary exterior adjustment blocks for the respective convector
length can be taken from the following tables.
Installation
kg
205
JBI:
A = 1180 mm
Содержание WLK 180
Страница 19: ...19 ENG DEU RUS ITA DAN Notizen ...
Страница 39: ...39 ENG DEU RUS ITA DAN Notes ...
Страница 59: ...RUS ENG DEU ITA DAN 59 Заметки ...
Страница 79: ...79 ITA ENG RUS DEU DAN NOTE ...
Страница 81: ...DAN ENG RUS ITA DEU MANUAL Systemkonvektor WLK 180 WLK 260 WLK 320 WLK 410 WLKP 180 WLKP 260 WLKP 320 WLKP 410 ...
Страница 99: ...99 DAN ENG RUS ITA DEU Notater ...