background image

MOHAWK MODELS SYSTEM IA & SYSTEM IA-10 

 

 

APPENDAGES 

 

RECOMMENDATIONS  BY  THE  INDIVIDUAL  USER  OR  USING 
ORGANIZATION  FOR  IMPROVING  THIS  PUBLICATION  OR  ANY 
ASPECT  OF  THE  PRODUCT  ARE  ENCOURAGED  AND  SHOULD  BE 
FORWARDED IN WRITING TO: 
 
 

MOHAWK RESOURCES LTD. 

 

PRODUCT IMPROVEMENTS 

 

65 VROOMAN AVE. 
AMSTERDAM, NY, 12010 

 
THIS  IS NOT  A VEHICLE  LIFTING PROCEDURE MANUAL  AND NO 
ATTEMPT IS MADE OR IMPLIED HEREIN TO INSTRUCT THE USER 
IN  LIFTING  METHODS  PARTICULARLY  TO  THE  INDIVIDUAL 
APPLICATION OF THE EQUIPMENT DESCRIBED IN THIS MANUAL. 
RATHER, THE CONTENTS OF THIS MANUAL ARE INTENDED AS A 
BASE 

LINE 

FOR 

OPERATION, 

MAINTENANCE, 

TROUBLE 

SHOOTING,  AND  PARTS  LISTING  OF  THE  UNIT  AS  IT  STANDS 
ALONE AND AS IT  IS INTENDED AND ANTICIPATED TO BE USED 
IN CONJUNCTION WITH OTHER EQUIPMENT. 

 

PROPER  APPLICATION  OF  THE  EQUIPMENT  DESCRIBED  HEREIN 
IS 

LIMITED  TO 

THE  PARAMETERS  DETAILED 

IN  THE 

SPECIFICATIONS 

AND 

THE 

USES 

SET 

FORTH 

IN 

THE 

DESCRIPTIVE  PASSAGES.  ANY  OTHER  PROPOSED  APPLICATION 
OF 

THIS 

EQUIPMENT 

SHOULD 

BE 

DOCUMENTED 

AND 

SUBMITTED  IN  WRITING  TO  MOHAWK  RESOURCES  LTD.  FOR 
EXAMINATION.  THE USER  ASSUMES FULL RESPONSIBILITY  FOR 
ANY EQUIPMENT DAMAGE, PERSONAL INJURY, OR ALTERATION 
OF  THE  EQUIPMENT  DESCRIBED  IN  THIS  MANUAL  OR  ANY 
SUBSEQUENT DAMAGES. 

 

DO NOT WELD, APPLY HEAT, OR MODIFY THIS EQUIPMENT IN ANY 

MANNER WITHOUT WRITTEN AUTHORIZATION FROM

 MOHAWK 

RESOURCES  LTD.

 

CERTAIN  ALLOY  OR  HEAT-TREATED 

COMPONENTS MAY BE DISTORTED OR WEAKENED, RESULTING IN 
AN UNSAFE CONDITION. 

 
MOHAWK  RESOURCES  LTD.

 

IS  NOT  RESPONSIBLE  FOR 

DISTORTIONS,  WHICH  RESULT  FROM  WELDING  ON  THIS 
EQUIPMENT 

AFTER 

MANUFACTURING 

IS 

COMPLETED. 

UNAUTHORIZED 

WELDING, 

APPLICATION 

OF 

HEAT, 

OR 

MODIFICATION  OF  THIS  EQUIPMENT  VOIDS  ANY  AND  /  OR  ALL 
APPLICABLE WARRANTIES COVERING THIS EQUIPMENT. 

 

ALL  WARRANTIES  APPLICABLE  TO  THIS  EQUIPMENT  ARE 
CONTINGENT  ON  STRICT  ADHERENCE  TO  THE  MAINTENANCE 
SCHEDULES AND PROCEDURES IN THIS MANUAL. 
 
KEEP ALL SHIELDS AND GUARDS IN PLACE. INSURE ALL SAFETY 
MECHANISMS  ARE  OPERABLE.  KEEP  HANDS,  FEET,  AND 
CLOTHING AWAY FROM POWER-DRIVEN AND MOVING PARTS. 

 

WARNING 

 

DO  NOT  INSTALL  THIS  UNIT  IN  A  PIT  OR  DEPRESSION  DUE 
TO FIRE OR EXPLOSION RISK 

 

IMPORTANT NOTE

 

 
A  LEVEL  FLOOR  IS  SUGGESTED  FOR  A  PROPER  INSTALLATION 
SITE  AND  WILL  ENSURE  LEVEL  LIFTING.  SMALL  DIFFERENCES 
IN  FLOOR  SLOPES  MAY  BE  COMPENSATED  FOR  WITH  SPECIAL 
LIFTING PADS.  ANY MAJOR SLOPE CHANGES WILL AFFECT THE 
LOW  PROFILE  HEIGHT  OF  THE  LIFTING  PADS  AND  /  OR  THE 
UNITS  LEVEL  LIFTING  PERFORMANCE.  IF  A  FLOOR  IS  OF 
QUESTIONABLE  SLOPE,  CONSIDER  A  SURVEY  OF  THE  SIGHT 
AND  /  OR  THE  POSSIBILITY  OF  POURING  A  NEW  LEVEL 
CONCRETE  SLAB  SECTION.  SIMPLY  STATED,  FOR  OPTIMUM 
LEVEL  LIFTING,  THE  EQUIPMENT,  AT  BEST,  CAN  LIFT  ONLY  AS 

LEVEL AS THE FLOOR ON WHICH IT IS LOCATED... AND SHOULD 
NOT  BE  EXPECTED  TO  COMPENSATE  FOR  DRASTIC  FLOOR 
SLOPE DIFFERENCES. 
 
THIS  EQUIPMENT  MUST  BE  INSTALLED  ON  A  LEVEL  CONCRETE 
FLOOR  WITH  A  MINIMUM  THICKNESS  OF  4-1/2”  THE  CONCRETE 
MUST  BE  AGED  AT  LEAST  (28)  TWENTY  EIGHT  DAYS  PRIOR  TO 
INSTALLATION 

AND 

HAVE 

MINIMUM 

COMPRESSIVE 

STRENGTH OF  4000 P.S.I. 
 
DO NOT INSTALL THIS UNIT ON ANY ASPHALT SURFACE. 
 
DO  NOT  INSTALL  THIS  UNIT  ON  ANY  SURFACE  OTHER  THAN 
CONCRETE  CONFORMING  TO  THE  MINIMUM  SPECIFICATIONS 

STATED 

IN 

THE

 

PRE-EXISTING 

 

FLOOR 

REQUIREMENTS SECTION. 

 
DO  NOT  INSTALL  THIS  UNIT  ON  EXPANSION  SEAMS  OR  ON 
CRACKED,  DEFECTIVE  CONCRETE.  CHECK  WITH  BUILDING 
ARCHITECT. 
 
DO  NOT  INSTALL  THIS  UNIT  ON  A  SECOND  FLOOR  OR  ANY 
GROUND  FLOOR  WITH  A  BASEMENT  BENEATH  WITHOUT 
WRITTEN AUTHORIZATION FROM THE BUILDING ARCHITECT. 
 

INSTALL THIS EQUIPMENT ON CONCRETE ONLY 

 
IF,  FOR  ANY  REASON,  A  NEW  CONCRETE  SLAB  SECTION  IS 
REQUIRED, 

THE 

MINIMUM 

THICKNESS, 

COMPRESSIVE 

STRENGTH,  AND  AGING  ARE  MANDATORY.  FOR  YOUR 
PROTECTION, CERTIFIED STRENGTH DOCUMENTATION SHOULD 
BE  OBTAINED  FROM  THE  FIRM  WHO  SUPPLIES  THE  CONCRETE 
MIXTURE AT THE TIME OF THE POUR. SPECIAL CONSIDERATION 
SHOULD  BE  MADE  TO  THE  JOINING  OF  THE  EXISTING  FLOOR 
AND THE NEW SECTION BEING ADDED.  CHECK WITH BUILDING 
ARCHITECT.  THE  SUGGESTED  SIZE  OF  THE  NEW  CONCRETE 

SLAB 

SECTION 

IS 

SHOWN 

IN 

THE 

NEW 

SLAB 

RECOMMENDATIONS SECTION. 

 

CAUTION

 

THE  EQUIPMENT  DESCRIBED  IN  THIS  MANUAL  COULD  BE 
POTENTIALLY  DANGEROUS  IF  IMPROPERLY  OR  CARELESSLY 
OPERATED.  FOR  THE  PROTECTION  OF  ALL  PERSONS  AND 
EQUIPMENT,  ONLY  COMPETENTLY  TRAINED  OPERATORS  WHO 
ARE  CRITICALLY  AWARE  OF  THE  PROPER  OPERATING 
PROCEDURES, 

POTENTIAL 

DANGERS, 

AND 

SPECIFIC 

APPLICATION  OF  THIS  EQUIPMENT  SHOULD  BE  ALLOWED  TO 
TOUCH THE CONTROLS AT ANY TIME. 
 
SAFE  OPERATION  OF  THIS  EQUIPMENT  IS  DEPENDENT  ON  USE, 
IN COMPLIANCE WITH THE OPERATION PROCEDURES OUTLINED 
IN  THIS  MANUAL  ALONG  WITH  THE  MAINTENANCE  AND 
INSPECTION 

PROCEDURES 

WITH 

CONSIDERATION 

OF 

PREVAILING CONDITIONS. 
 
THE  EQUIPMENT  DESCRIBED  IN  THIS  MANUAL  IS  NEITHER 
DESIGNED NOR INTENDED FOR ANY APPLICATION ALONE OR IN 
CONJUNCTION  WITH  ANY  OTHER  EQUIPMENT  THAT  INVOLVES 
THE LIFTING OR MOVING OF 

PERSONS. 

 
ALWAYS  CONSULT  THE  VEHICLE  LIFTING  GUIDE  FOR  THE 
PROPER  LIFTING  POINTS  ON  ANY  VEHICLE.  THESE  GUIDES  ARE 
AVAILABLE FROM THE VEHICLE MANUFACTURERS. 
AFTER  LIFTING  THE  VEHICLE  TO  THE  DESIRED  HEIGHT, 
ALWAYS  LOWER  THE  UNIT  ONTO  THE  MECHANICAL  SAFETIES. 
THE  FORMING  OF  GOOD  OPERATIONAL  WORK  HABITS  WILL 
ELIMINATE  OVERSIGHTS  IN  THE  USE  OF  PROVIDED  SAFETY 
DEVICES.

 

Содержание IA

Страница 1: ...stem IA 9 000 LB CAPACITY TWO POST System IA 10 10 000 LB CAPACITY TWO POST VEHICLE LIFT MANUAL INSTALLATION OPERATION MAINTENANCE PARTS Standard Mohawk Models System IA and System IA 10 MOHAWK RESOURCES LTD 65 VROOMAN AVE AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET WWW MOHAWKLIFTS COM E MAIL SERVICE MOHAWKLIFTS COM System IA 10 12 18 2013 doc Rev D...

Страница 2: ... electrical outlet when not in use Never use the cord to pull the plug from the outlet Grasp plug and pull to disconnect 6 To reduce the risk of fire do not operate equipment in the vicinity of open containers of flammable liquids gasoline WARNING Risk of Explosion This equipment has internal arcing and sparking parts which should not be exposed to flammable vapors This equipment is only suitable ...

Страница 3: ...lift are to be used on this lift only Accessories from other lifts are not acceptable and could result in injury to the user If attachments accessories or configuration modifying components are used on this lift and if they are not certified for use on this lift then the certification of this lift shall become null and void Contact the participant Mohawk Resources Ltd for information pertaining to...

Страница 4: ... injury to the user NOTICE In the event that the ceiling height or hydraulic line height is reduced less than the standard heights recommended for the lift an OVERHEAD SHUT OFF DEVICE MUST BE EMPLOYED Note that underground hydraulic lines are available but the ceiling height must still be adequate to provide clearance for the tallest lifted vehicle Ensure that the whole fleet of vehicles is review...

Страница 5: ... Here Please have this unit s model and serial number when calling for service Model Number ______________________ Serial Number ______________________ OR CONTACT MOHAWK RESOURCES LTD 65 Vrooman Ave P O Box 110 Amsterdam NY 12010 Toll Free 1 800 833 2006 Local 1 518 842 1431 Fax 1 518 842 1289 Internet www MOHAWKLIFTS com E Mail Service MOHAWKLIFTS com ...

Страница 6: ...ing laboratory NRTL in accordance with ANSI UL 201 The manufacturer s production facility must meet quality control requirements as set forth in the ANSI Z34 1 1987 and the ALI ETL Automotive Lift Certification Program Procedural Guide All manufacturer provided instructions manuals and operator safety documents must meet the requirements of the ANSI ALI ALCTV 2011 and ANSI UL 201 Lifts meeting the...

Страница 7: ...IN THE UNITED STATES OF AMERICA AND CANADA CONTACT MOHAWK RESOURCES LTD FOR SPECIFIC WARRANTY PROVISIONS FOR UNITS LOCATED OUTSIDE OF THESE COUNTRIES THIS WARRANTY DOES NOT COVER NORMAL SURFACE WEAR ITEMS ITEMS SUBJECT TO ABRASION OR ITEMS USED IN A CORROSIVE ENVIRONMENT SOME ITEMS ON LIFT ARE SUBJECT TO NORMAL WEAR AND TEAR AND ARE NOT COVERED UNDER THIS WARRANTY STRUCTURAL COMPONENTS ALL LIFTS S...

Страница 8: ...RTS FROM THE DATE OF SHIPMENT FROM FACTORY AGAINST DEFECTS IN WORKMANSHIP AND OR MATERIALS WHEN LIFT IS INSTALLED AND USED ACCORDING TO SPECIFICATIONS CUSTOM LIFTS AND OPTIONS ALL CUSTOM LIFTS AND OR CUSTOM OPTIONS ARE GUARANTEED ON A CASE BY CASE BASIS CONSULT MOHAWK FACTORY FOR DETAILS ON SPECIFIC CUSTOM LIFTS AND OR OPTIONS WARRANTY EXCEPTIONS ALL LIFTS ADJUSTMENTS THIS WARRANTY DOES NOT COVER ...

Страница 9: ... CHAIN BREAK SAFETY CABLE 15 37 LIFTING PAD PROCEDURES 16 38 PARTS FIGURE PAGE ISOMETRIC FINAL ASSEMBLY MAN257A 40 MAIN SIDE ASSEMBLY MAN256 41 OFF SIDE ASSEMBLY 009 030 004 42 CARRIAGE ARM LOCK ASSEMBLY MAN222A 43 HYDRAULIC SYSTEM MAN201 44 CARRIAGE ASSEMBLY 009 030 005 45 LOCK BODY ASSEMBLY 009 030 006 46 YOKE ASSEMBLY MAN204 47 HEIGHT ADAPTER BRACKET CYLINDER CLAMPS MAN205 48 CARRIAGE SWING ARM...

Страница 10: ...URVEY OF THE SIGHT AND OR THE POSSIBILITY OF POURING A NEW LEVEL CONCRETE SLAB SECTION SIMPLY STATED FOR OPTIMUM LEVEL LIFTING THE EQUIPMENT AT BEST CAN LIFT ONLY AS LEVEL AS THE FLOOR ON WHICH IT IS LOCATED AND SHOULD NOT BE EXPECTED TO COMPENSATE FOR DRASTIC FLOOR SLOPE DIFFERENCES THIS EQUIPMENT MUST BE INSTALLED ON A LEVEL CONCRETE FLOOR WITH A MINIMUM THICKNESS OF 4 1 2 THE CONCRETE MUST BE A...

Страница 11: ...DETERMINED BY THE TYPE LENGTH WIDTH HEIGHT OF VEHICLE BEING SERVICED WEJ IT ANCHOR SPECIFICATIONS LENGTH DRILL DEPTH DRILL SIZE DRILL SIZE MIN MAX TORQUE 5 IN THRU 3 4 IN 775 IN 787 IN SEE ANCHOR SPECS PRE EXISTING FLOOR REQUIREMENTS MINIMUM THICKNESS MINIMUM COMPRESSIVE STRENGTH MINIMUM AGING 4 1 2 IN 4000 P S I 28 DAYS DO NOT INSTALL ANY MOHAWK LIFT ON ANY SURFACE OTHER THAN CONCRETE CONFORMING ...

Страница 12: ...HIM BAG 1 284 009 010 071 SMALL PARTS BAG 1 281 009 010 114 SWING ARM PIN 4 600 670 002 WEJ IT ANCHOR 3 4 x 5 16 284 009 010 071 SMALL PARTS BAG CONTENTS 171 600 640 019 BOLT 1 4 20 X 1 1 2 10 258 600 690 005 LOCK NUT 1 4 20 NC 10 259 600 710 004 WASHER 1 4 SAE FLAT 8 621 600 710 014 WASHER 1 3 8 SAE FLAT 8 021 601 310 005 BREATHER CAP 1 094 601 420 011 FITTING DOUBLE MALE UNION 6 JIC 4 409 601 71...

Страница 13: ...ENCH AS NEEDED 1 SNAP RING PLIERS AS NEEDED 1 VICE GRIPS AS NEEDED 2 IN CRESCENT WRENCH AS NEEDED 1 4 FT BUBBLE LEVEL VERIFY LEVEL ASSEMBLY 1 PRY BAR MOVING HEAVY ITEMS 1 TIN SNIPS PACKAGING BANDING 1 CHALK LINE FLOOR LAYOUT 1 SOAP STONE FLOOR LAYOUT 1 25 FT TAPE MEASURE FLOOR LAYOUT SQUARING POST 1 MEDIUM HAMMER WEJ IT ANCHORS 1 HAMMER DRILL DRILLING CONCRETE 1 DRILL BIT 3 4 INCH DRILLING CONCRET...

Страница 14: ...SPECIAL ORDERS SPECIFICATIONS REFERENCE ALL SPECIFICATIONS PRIOR TO INSTALLING A LIFT WARNING BEFORE DRILLING THE MOUNTING HOLES ALL ANCHORS MUST BE A MINIMUM OF 6 INCHES AWAY FROM ANY EXPANSION SEAMS CONTROL JOINTS OR OTHER INCONSISTENCIES IN THE CONCRETE REFER TO ANCHOR MANUFACTURER SPECIFICATIONS FOR SPECIFIC INFORMATION CONCERNING EDGE DISTANCES AND BOLT TO BOLT DISTANCE REQUIREMENTS REFER TO ...

Страница 15: ...MAN201 ASSEMBLE TWO OF THE DOUBLE LINE CLIPS TO THE CENTER SPAN OF THE OVERHEAD LINES APPROXIMATELY 3 INCHES FROM THE DOUBLE UNIONS ASSEMBLE THE TWO OVERHEAD LINE SUPPORT BRACKETS TO THE TOP OF THE MAIN AND OFF SIDE POST ERECT THE OVERHEAD HYDRAULIC LINE ASSEMBLIES ROUTE THE LINES THROUGH THE TOP OF EACH POST ASSEMBLE THE LINES TO THE HYDRAULIC CONNECTIONS AT THE TOP OF EACH POST SECURE THE LINES ...

Страница 16: ...SIDE TO SIDE USING A BUBBLE LEVEL LEVEL THE OFF SIDE POST FRONT TO REAR USING A BUBBLE LEVEL SET THE POST PARALLEL TO THE MAIN SIDE POST USING A MEASURING TAPE MEASURING FROM THE EDGE OF THE MAIN SIDE CHANNEL TO THE EDGE OF THE OFF SIDE CHANNEL AT THE BASE AND AT THE TOP OF THE POST THE MEASUREMENT AT THE TOP OF THE POST MUST BE THE SAME AS THE MEASUREMENT AT THE BASE OF THE POST AT THIS TIME PERF...

Страница 17: ... GREASE AND OIL PERFORM THE PRE OPERATION CHECK LIST PER INSTRUCTIONS BEFORE RAISING VEHICLE TO DESIRED HEIGHT BEFORE DRIVING VEHICLE INTO THE BAY POSITION ARMS AND SUPPORTS TO PROVIDE UNOBSTRUCTED CLEARANCE DO NOT HIT OR RUN OVER LIFT ARMS ADAPTERS OR AXLE SUPPORTS THIS COULD DAMAGE LIFT OR VEHICLE LOAD VEHICLE ON LIFT CAREFULLY POSITION LIFT SUPPORTS TO CONTACT AT THE VEHICLE MANUFACTURER S RECO...

Страница 18: ...E ENGAGING ON BOTH POSTS AS LIFT IS RAISING LIFT IS NOT DRIFTING DOWN WHEN RAISED RAISE LIFT THEN STOP AND VERIFY DRIFT DOWN OF CYLINDERS NO VIBRATIONS FROM LOOSE CLAMPING ETC RELEASE LOCKS AND LOWER UNIT VERIFY THE FOLLOWING PROPER SYNCHRONIZATION OF LIFT ARMS UNIT IS LOWERING SMOOTHLY AIR IS BLEED FROM HYDRAULIC SYSTEM SEE BLEEDING PROCEDURE FOR MORE DETAILS NO LEAKS PRESENT AT ANY FITTING JUNCT...

Страница 19: ...ICLES AS A RULE OF THUMB THE VEHICLE LENGTH ON A 2 POST MUST BE LIMITED TO 4 TIMES THE LENGTH OF THE ARM SPREAD TO RAISE IT THE CENTER OF GRAVITY ON THIS VEHICLE MUST LIE BETWEEN THE LIFTING PADS TO ACCOMPLISH THIS NOTE THAT SOME VEHICLES PER VEHICLE MANUFACTURER GUIDELINES ARE NOT TO BE RAISED BY THE FRAME REFER TO VEHICLE MANUFACTURER GUIDELINES FOR PROPER LIFTING TECHNIQUES THIS LIFT IS NOT INT...

Страница 20: ... ARE LOCATED AT EACH CORNER OF THE CARRIAGE CENTERING OF VEHICLE IS ACHIEVED WHEN ALL 4 CAM FOLLOWER BEARINGS ARE FREE TO SPIN PLACE THE LIFTING PADS PER MFG S RECOMMENDED LIFT POINTS FOR THE VEHICLE REFER TO ALI LP GUIDE ALI SMO1 2 LIFTING IF RIGHT GUIDE AND REFER TO THE RECOMMENDED LOCATION AND FORMAT OF THE VEHICLE LIFT POINT LABEL PER ANSI SAE J2184 OCT92 PLACE THE LIFTING PADS PER MFG S RECOM...

Страница 21: ...E SAFE OPERATION OF THIS UNIT VERIFY ALL FASTENERS TO PROPER TORQUE SWING ARM NUTS TO 1000 FT LB THEN BACK OFF UNTIL ARMS MOVE FREELY CARRIAGE STOP FASTENERS TO 150 FT LB CARRIAGE SIDE ROLLER NUTS TO 50 FT LB ANCHORS SEE ANCHOR SPECIFICATION SECTION LUBRICATE LOCK BODY MAIN PIVOT PINS REMOVE WITH SNAP RING PLIERS WHEN FULLY LOWERED AND CLEAN LOCK PIVOT PIN AND LOCK BODY HOLE SPRAY PIN WITH A LIGHT...

Страница 22: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 14 ...

Страница 23: ...ting in higher wear rates and reduced strength Eliminating twist from a cable will make the cable easier to handle and increase its life Chemicals Synthetic fibers have good chemical resistance However exposure to harsh chemicals such as acids and alkalis should be avoided Damage Inspect all cables frequently for signs of wear or damage especially at eyebolt areas Retire any cable that is cut worn...

Страница 24: ...ns of a loosening of strands and the presence of powdered fiber It is most often caused when grit becomes trapped in a cable which is repeatedly flexed in wet conditions If signs of this are detected replace cable Attack by heat This may be revealed by glazing of the cable surface In extreme cases local fused sections indicate heat through friction and a considerable loss of strength can be expect...

Страница 25: ... DEXRON III TRANSMISSION HYDRAULIC FLUID PRESSURE RELIEF ADJUSTMENT CONSULT MOHAWK SERVICE DEPARTMENT PRESSURE RELIEF CONTAMINATION REFER TO POWER UNIT SPECIFICATIONS REMOVE AND CLEAN DEBRIS FROM VALVE ASSEMBLY VOLTAGE TO POWER UNIT REFER TO POWER UNIT SPECIFICATIONS CONSULT AN ELECTRICIAN UNIT OVERLOADED VEHICLE IS TO HEAVY TO BE RAISED NOT LOWERING MECHANICAL LOCKS ENGAGED RAISE UNIT DISENGAGE M...

Страница 26: ... DRIFT DOWN THE DIVERTER PULL VALVE WILL NEED TO BE CLEANED OR REPLACED BLEEDER VALVE REMOVE BLEED LINE FROM THE TOP OF THE OFF SIDE CYLINDER AND CAP USING MOHAWK PART 601 420 001 IF THE UNIT NO LONGER DRIFTS DOWN THE BLEEDER VALVE WILL NEED TO BE SERVICED OR REPLACED EXTERNAL HYDRAULIC LEAKS NOTE TIGHTEN ALL FITTINGS PER SPECIFICATIONS MAIN SIDE CYLINDER THOROUGHLY CLEAN THE CYLINDER VERIFY LEAK ...

Страница 27: ...C ARTICLE 250 GROUNDING AND APPLICABLE LOCAL CODES 5 DENOTE WIRE NUMBERS WHERE APPLICABLE 6 LABEL MARKERS SHALL BE PLACED ON ALL WIRES BOTH ENDS SWITCHES RELAYS LAMPS ETC ALL WIRES TO BE INSTALLED WITH TERMINAL LUGS ALL CONNECTIONS SHALL BE WRENCH TIGHT WHERE APPLICABLE 7 THE FOLLOWING COLOR WIRES SHALL BE RESERVED GREEN ALL EQUIPMENT GROUNDING CONDUCTORS WHITE ALL NEUTRAL CONDUCTORS 8 VERIFY PROP...

Страница 28: ...LS SYSTEM IA SYSTEM IA 10 20 MODEL SERIAL NUMBER DATE OF INSTALLATION SERVICE CHART DATE PART REPLACED SERVICED SERVICE COMPANY SERVICED BY MAINTENANCE CHART DATE MAINTENANCE PERFORMED SERVICE COMPANY SERVICED BY ...

Страница 29: ...0 21 MOHAWK FIGURES DIAGRAMS MOHAWK RESOURCES LTD 65 VROOMAN AVE AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET WWW MOHAWKLIFTS COM E MAIN SERVICE MOHAWKLIFTS COM MODEL SYSTEM IA SYSTEM IA 10 ...

Страница 30: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 22 Figure 1 ...

Страница 31: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 23 Figure 2 ...

Страница 32: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 24 Figure 3 ...

Страница 33: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 25 Figure 4 ...

Страница 34: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 26 Figure 5 ...

Страница 35: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 27 Figure 6 ...

Страница 36: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 28 Figure 7 ...

Страница 37: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 29 Figure 8 ...

Страница 38: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 30 Figure 8A ...

Страница 39: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 31 Figure 9 ...

Страница 40: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 32 Figure 10 ...

Страница 41: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 33 Figure 11 ...

Страница 42: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 34 Figure 12 ...

Страница 43: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 35 Figure 13 ...

Страница 44: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 36 Figure 14 ...

Страница 45: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 37 Figure 15 ...

Страница 46: ......

Страница 47: ...IA 10 39 MOHAWK PARTS MANUAL MOHAWK RESOURCES LTD 65 VROOMAN AVE AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET WWW MOHAWKLIFTS COM E MAIN SERVICE MOHAWKLIFTS MODEL SYSTEM IA SYSTEM IA 10 ...

Страница 48: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 40 ...

Страница 49: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 41 ...

Страница 50: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 42 ...

Страница 51: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 43 ...

Страница 52: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 44 ...

Страница 53: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 45 ...

Страница 54: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 46 ...

Страница 55: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 47 ...

Страница 56: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 48 ...

Страница 57: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 49 ...

Страница 58: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 50 ...

Страница 59: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 51 ...

Страница 60: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 52 ...

Страница 61: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 53 ...

Страница 62: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 54 ...

Страница 63: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 55 ...

Страница 64: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 56 ...

Страница 65: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 57 ...

Страница 66: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 58 ...

Страница 67: ...MOHAWK MOHAWK RESOURCES LTD 65 VROOMAN AVE AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET www MOHAWKLIFTS com E MAIN Service MOHAWKLIFTS com PRE EXISTING SLAB REQUIREMENTS NEW SLAB RECOMMEDATIONS ...

Страница 68: ...kness range less than 6 but greater or equal to 4 1 2 The floor should be test drilled to verify minimumfloor thickness and to confirmbuilding drawings A core sample should be obtained and tested to verify minimumfloor compressive strength When investigating floor properties consult building drawings to verify proper floor reinforcement All 2 post lifts require a continuous single slab Spanning ex...

Страница 69: ...entation should be obtained from the firm who supplies the concrete mixture at the time of the pour The slab above is designed as stand alone and does not take into account the contribution of strength from surrounding concrete It may be desirable to reinforce the new slab to the pre existing surrounding floor Care should be taken to locate these specific reinforcement bars away from any anchor po...

Страница 70: ...2 Min 220 Min 18 4 Main Bars 24 4 Temperature Bars 4 in Long Bars 8 in Short Bars 1 in 8 in TR 19 24 Min 24 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in FL 25 24 Min 24 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in TR 25 24 Min 24 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in TR 30 48 Min 48 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in TR 33 72 Min 72 Min 12 4 Bars 24 Bar...

Страница 71: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 63 ...

Страница 72: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 64 ...

Страница 73: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 65 ...

Страница 74: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 66 ...

Страница 75: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 67 ...

Страница 76: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 68 ...

Страница 77: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 69 ...

Страница 78: ...MOHAWK MODELS SYSTEM IA SYSTEM IA 10 70 ...

Страница 79: ...IFTS ARE USED WE HAVE CREATED AN ON LINE PHOTO DATABASE FOR CUSTOMERS TO VIEW OUR LIFTS IN USE VISIT WWW MOHAWKLIFTS COM PR AND MAYBE WE CAN ADD YOUR PHOTOS TO OUR COLLECTION JPG FORMATS PREFERED E MAIL YOUR PHOTOS AND COMMENTS TO PHOTOS MOHAWKLIFTS COM BEST REGARDS HAPPY LIFTING YOUR FRIENDS AT MOHAWK LIFTS ...

Отзывы: