8
When the hob is first installed
Once the hob has been installed, it is
important to remove any protective
materials, which were put on in the
factory.
On the end of the shaft, which includes the
GJ 1/2" threaded elbow, adjustment is fixed
so that the washer is fitted between the
components as shown in the diagram. Screw
the parts together without using excessive
force.
A)
End of shaft with nut
B)
Washer
C)
Elbow
It is important to install the elbow
correctly, with the shoulder on the end
of the thread, fitted to the hob
connecting pipe.
Failure to ensure the correct assembly
will cause leakage of gas.
FO 0814
Gas Connection
Connection to the gas supply should be with
either rigid or semi-rigid pipe, i.e. steel or
copper.
The connection should be suitable for
connecting to RC 1/2 (1/2 BSP male thread).
When the final connection has been made, it
is essential that a thorough leak test is carried
out on the hob and installation.
Ensure that the main connection pipe does
not exert any strain on the hob.
FO 0264
Cut Out Size
The dimensions of the cut-out are given in the
diagram.
550
47
0
30
FO 2098
Dimensions are given in mm.
Installation
Содержание MGH 621
Страница 15: ......
Страница 16: ...Grafiche MDM Forlì 35676 2903 07 06 www electrolux com ...