background image

3

21.00"
16.75"

Support Superstructure

Structural Ceiling

15" dia.

Opening in Finished Ceiling

2" x 2" min. Heavy-Gauge

Tubing or Angle (as required

by engineer of record)

4" ± 0.25"

1/2" Steel

Rough-In Plate

Center of plate is also

centerline of unit

79" radius from 

this point 

Typical Support Superstructure

Dimension “A” to clear 16.75"

Dimension “A” to be no greater than 17"

Rough-In Plate

Bottom of

Finished Ceiling

Service Entry

Bracket

A

A

Support Ring

1/2" Steel 

Support Ring

MAXIMUM LOAD 1000 LBS.

MAX. BENDING MOMENT 4010 FT-LBS
MAXIMUM DEFLECTION OF 

SUPPORT  STRUCTURE = 0.05"/ft (0.25°)

Plate to rest on this surface

1. All design, fabrication and materials other than the rough-in plate assembly are the responsibility of the engineer of record.
2. Rough-in plate is to be welded or bolted to support superstructure by customer/contractor, subject to engineer of record’s 

    approval and must be level within 1/4".

NOTE:

 Rough-in plate is mounted on top of structural supports with support ring facing downward, as shown above.

NOTE:

 The 4" distance between the bottom of 

the rough-in plate and the bottom of the finished 

ceiling, as well as the 15" diameter ceiling 

opening, are critical for proper installation.

Modular Services Company offers a pre-manufactured 

superstructure that has been approved for these loading 

and deflection specifications, along with worst-case 

seismic conditions. Contact your sales representative 

for more information.

21.00"

16.75"

Figure 1a.

Содержание STRATUS II

Страница 1: ...Installation Manual STRATUS II STRATUS II...

Страница 2: ...e unit Room numbers and location in the building if applicable PREPARATION A support superstructure purchased separately or provided by others is to be constructed above the finished ceiling and firml...

Страница 3: ...ication and materials other than the rough in plate assembly are the responsibility of the engineer of record 2 Rough in plate is to be welded or bolted to support superstructure by customer contracto...

Страница 4: ...surface 1 All design fabrication and materials other than the rough in plate assembly are the responsibility of the engineer of record 2 Rough in plate is to be welded or bolted to support superstruc...

Страница 5: ...RE 0 05 ft 0 25 Plate to rest on this surface Vertical supports on 25 centers 1 All design fabrication and materials other than the rough in plate assembly are the responsibility of the engineer of re...

Страница 6: ...arm unit while installing Lift crate with arm into position and place the Stratus II arm assembly onto the studs and thread three hex nuts across from each other Level the Stratus II arm assembly wit...

Страница 7: ...ate into place using specified lift Figure 7 Level unit and tighten all nuts to at least 150 ft lbs Figure 8 When unit is secured to mounting plate remove crate Figure 6 Figure 7 Tighten these nuts AF...

Страница 8: ...e the column in position to prevent the unit from tipping over 2 Route gas hoses and electrical cables through arms Figure 9 3 Raise the Stratus II column to the mounting plate at the bottom of the lo...

Страница 9: ...the service entry bracket item 2 Brake Release Handle 1 Plug handle into wire harness protruding from the corner of the column and attach handle to track Figure 12 2 Tighten set screws on the side of...

Страница 10: ...gas piping systems have been completed ELECTRICAL CONNECTIONS 1 Ensure that all electrical power circuits are locked off prior to hook up 2 Review the wiring diagram or shop drawings 3 All connection...

Страница 11: ...otate the joint in the other direction and repeat steps 1 4 above FINAL ASSEMBLY Bearing Covers 1 Verify that all medical gas and electrical connections have been completed and successfully tested pri...

Страница 12: ...age safety cord Figure 18 3 Align push on connectors in the end cap with the connectors on the arm and tap end cap firmly to engage CARE AND MAINTENANCE 1 Clean with mild detergent and warm water Do n...

Страница 13: ...han those expressly contained herein WARRANTY Modular Services Company warrants that all equipment assemblies shall be free from defects in material and workmanship for a period of 12 months from the...

Страница 14: ...ses low voltage devices and range of motion are Stratus Warranty Checklist Please verify correct room side location for each unit and initial all of the items below that apply Any steps that are not c...

Отзывы: