•
Place the mattress directly on the
bed frame with the tubes going to
the pump facing downwards.
•
Hang the air cushion pump on the
bed where the legs end up or place it
on a firm flat surface.
•
Connect the quick links as shown in
the pictures left.
Front
Back
3. Quick connection male
4. Fuse
5. Filter
6. Filter cover
7. Bed hooks
1.
Control Panel
2.
Quick Connection female
INSTALLATION
12
1
2
5
3
4
6
1- Cover
2- Fastening belts
3- Quick connection male
4- Quick connection cover
5- Air supply pipes
6- CPR valve
Содержание 0806288
Страница 2: ...15 Stage to II EL 12 2 ON OFF...
Страница 3: ...3 30 180 kg 10kg 4 L 5 LED 30 2 1 OFF 4 ALARM 5 5 3 0806289 5 3 0806290 DIGITAL 3...
Страница 4: ...1 2 3 4 5 6 CPR 3 4 5 6 7 1 2 4 1 2 5 3 4 6...
Страница 6: ...6...
Страница 7: ...7...
Страница 8: ...1 2 3 8 93 42 8 130648 2198 02 10 2009 T 1 1 93 42...
Страница 9: ...To 2 6 S N LOT 96 98 30 28210 63222 www mobiakcare gr 9...