MK-100
Revision 1/01, Effective Date January 23, 2001
Page 15
SETUP, ADJUSTMENT and OPERATION
SETUP:
1. Pre-start Inspection:
Prior to beginning work, a pre-start inspection of the saw should be preformed.
2. Connecting the Water Pump:
1.
To prevent the possibility electrical shock, the MK-100 MUST be de-energized when connecting
the Water Pump.
2.
To prevent the possibility of electrical shock, use only MK Diamond qualified replacement parts
NOTE: To prevent pump damage, the Water Pump must be disconnected if cutting with a Dry Blade.
(A)
Ensure the ON/OFF Switch
is in the OFF position
(B)
Verify the Movable Cutting Table
moves freely
(C)
Inspect the Diamond Blade for
damage – verify the blade is
correct for the material being cut
(D)
Inspect the Pump Assembly
for damage – ensure the cord
is free of cracks or cuts
(E)
Inspect the MK-100
for damage – ensure the cord
is free of cracks or cuts
Inspect for cracks,
de-bonding, etc.
Press
together
Verify ease of movement
(See Maintenance section
if problems exist)
Inspect for
damage
Inspect for
damage
Inspect for
cracks or cuts
Off
Position
ON/OFF
Switch
(A)
Connect the Cooling Transfer
Tube to the inlet connection
of the Blade Guard
(B)
Connect the Water Pump power
cord to the connection found on
the back of the motor
Press on
Cooling
Transfer
Tube
Inlet
connection
Pump
Connection