background image

Pre-Construction Installation

!

!

IMPORTANT! - MAKE SURE WALL ELECTRICITY IS
TURNED OFF BEFORE STARTING INSTALLATION !

1. Attach the mounting strips to 
the pre-construction bracket with 
the included sheet metal screws.

2. Attach the bracket assembly 
to the wall studs with screws or 
nails (not included).

4. Measure and mark the drywall with 
the template and attach the drywall
to the stud wall.

5. Rough cut the drywall opening to the inside
of the marked line making sure that you are
cutting inside the pre-construction bracket
opening. Continue to cut the opening using
the bracket flange as a guide. Slightly angle
the cut to the outside so that you can pull
the bracket flange through the drywall opening.

(8)

rough cut

3. Run the speaker wire to the location
of the bracket. Secure the wire to one
of the studs using staples or U nails. 
Make sure that the wire is clear of the
opening or it may be damaged when
the drywall is cut.             

staples

Note: Detailed Pre-Construction instructions
are included with the Pre-Construction 
Bracket kit SPRE95. The following instructions
are intended as an overview only.

Содержание BE-65

Страница 1: ...part number SPRE 95 THESE ARE THE MAJOR COMPONENTS OF YOUR NEW SPEAKER SYSTEM 1 Foam Dampening Pad Foam TABLE OF CONTENTS Page 1 Component Overview Page 2 Connecting Wires to Speakers Page 3 Remote Ho...

Страница 2: ...h the tonal balance you have selected for your SW 85 or SW 95 speaker For more information see your SW 85 SW 95 instructions Hookup For each channel run one pair of wires from the amplifier to each BE...

Страница 3: ...REMOTE SWITCHER Allows the user to select SW 85 SW 95 Tonal Characteristic Requires 2 sets of speaker wires If you have a remote amplifier switcher you can switch between tonal balances on your SW 85...

Страница 4: ...Be careful when bending and handling the foam so that you do not rip it 8 Mount the adhesive backed foam pad in the wall behind the woofer 4 speaker wire Note Do not put any other acoustic filler wit...

Страница 5: ...ant Apply sealant Apply sealant Cut out Vanfill Foam Wall Stud Floor 7 7 16 10 3 4 4 1 4 5 Acoustic Frame Apply silicon based sealant to the foam frame joints It is very important to form an airtight...

Страница 6: ...ottom portion of the mounting arms into the wall opening 11 Tip the unit vertically and pass the top edge of the mounting arms through the wall opening allowing the unit to rest on the bottom mounting...

Страница 7: ...securely mounted on magnets by tapping on it s surface Remove the grille and reposition magnets if necessary 15 The grille can be painted with Latex paint to match the wall color if desired Make sure...

Страница 8: ...ine making sure that you are cutting inside the pre construction bracket opening Continue to cut the opening using the bracket flange as a guide Slightly angle the cut to the outside so that you can p...

Страница 9: ...ng baffle loosen screws sequentially until two inches of screw is exposed or screw stops If using a power screwdriver make sure that it is on a low torque setting to avoid stripping 2 3 Push the screw...

Отзывы: