Pre-Construction Installation
!
!
IMPORTANT! - MAKE SURE WALL ELECTRICITY IS
TURNED OFF BEFORE STARTING INSTALLATION !
1. Attach the mounting strips to
the pre-construction bracket with
the included sheet metal screws.
2. Attach the bracket assembly
to the wall studs with screws or
nails (not included).
4. Measure and mark the drywall with
the template and attach the drywall
to the stud wall.
5. Rough cut the drywall opening to the inside
of the marked line making sure that you are
cutting inside the pre-construction bracket
opening. Continue to cut the opening using
the bracket flange as a guide. Slightly angle
the cut to the outside so that you can pull
the bracket flange through the drywall opening.
(8)
rough cut
3. Run the speaker wire to the location
of the bracket. Secure the wire to one
of the studs using staples or U nails.
Make sure that the wire is clear of the
opening or it may be damaged when
the drywall is cut.
staples
Note: Detailed Pre-Construction instructions
are included with the Pre-Construction
Bracket kit SPRE95. The following instructions
are intended as an overview only.