4 PROCEDURES BEFORE OPERATION
25
4
4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting modules
Mount the temperature control module in a desired configuration.
2.
Wiring
Wire external devices to the temperature control module.
Page 29 INSTALLATION AND WIRING
3.
Addition of modules
Use an engineering tool to add the temperature control module to the module configuration. For details, refer to the following.
GX Works3 Operating Manual
4.
Setting parameters
Use an engineering tool to set the parameters of the temperature control module. For details, refer to the following.
MELSEC iQ-R Temperature Control Module User's Manual (Application)
5.
Execution of auto tuning
To execute the auto tuning, set PID constants with the auto tuning function. For details, refer to the following.
MELSEC iQ-R Temperature Control Module User's Manual (Application)
Perform a warm-up operation for about 15 minutes before executing the auto tuning.
6.
Programming
Create a program. For details, refer to the following.
7.
Warm-up operation
Perform a warm-up operation for about 15 minutes before operation.
To prevent operations of the temperature control module from being affected by the temperature rise inside
the module just after the power-on, perform a warm-up operation for about 15 minutes before the auto tuning
or the operation.
Содержание MELSEC iQ-R series
Страница 2: ......
Страница 13: ...11 MEMO ...
Страница 15: ...13 CONTENTS TRADEMARKS 82 ...
Страница 19: ...1 PART NAMES 17 1 MEMO ...
Страница 28: ...26 4 PROCEDURES BEFORE OPERATION MEMO ...
Страница 52: ...50 6 INSTALLATION AND WIRING 6 5 Unused Channel Setting MEMO ...
Страница 79: ...APPENDIX Appendix 1 External Dimensions 77 A MEMO ...
Страница 81: ...I 79 MEMO ...
Страница 85: ......