47
• The contact data is an OR command. Accordingly, it becomes effective if the input on the main unit side
is turned on. Pay rigid attention.
The time required to transfer the contact data is as follows.
Required time (ms)
≒
100 + (Operation cycle in the master programmable controller)
• Because the high-speed parallel run mode is not supported, do not use it. Accordingly,
do not turn on the M8162.
The RS-485 board FX2N-485BD is required for the parallel wire link.
Connect between the LE-40MTB-E and the wire link adaptor with the twisted pair cables. Perform the
solid grounding at [ LFG ] in the LE-40MTB-E. The allowable maximum cable length is 10 m.
To execute parallel link with the LE-40MTB-E, use the " PC-link " screen in " Other " on the engineer
screen for setting.
4. Connection
LSA
LSB
LFG
SDA
RDA
SDB
RDB
SG
LE-40MTB-E
FX
2N
-485-BD
FX2N siries
PC
Grounding resistance
100
Ω
or less
Twisted pari cable
5. Setting
X
W
Reel diameter
monitor or tension
monitor screen.
Complete
initial setting
T
T
T
T
P
S S W O R D
S E T
→
# # # # #
S E T
N U M B E R
A
S
T T I N G
S E L E C T
M E N U
B Y
C U R S O R
S W I T C H
:
T E N S I O N
:
S T R T
S T P :
R E E L
C H G :
.
E
R E E L
C H
G :
R E E L
:
M R N U
:
O T H R E
S
T T I N G
S E L E C T
M E N U
B Y
C U R S O R
E
U N U S E
:
F X - P A R A L :
N E T /
I N I :
C C - L I N K
M
P
- L I N K
S E L E C T
P C - L I N K
C
Select " FX-PARAL "
Содержание LE-40MTB-E
Страница 2: ......
Страница 4: ......
Страница 79: ......
Страница 80: ...JZ990D30801F TENSION CONTROLLER MODEL LE 40MTB E ...